Toronto address · Ward 9, Davenport
296 Bartlett Ave
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Examiner's notice sent
Drains and site services
Drain - Interior alterations to legalize existing single family dwelling into 4 units
Applied Sep 1, 2026 · Permit 25 108959 DRN
- Refusal notice
Plumbing
Plumbing - Interior alterations to legalize existing single family dwelling into 4 units
Applied Sep 1, 2026 · Permit 25 108959 PLB
- Revision issued
Small residential project · Multiple projects
REVISION - alterations to exterior walls (non-combustible cladding)Interior alterations to legalize existing single family dwelling into 4 units
Applied Feb 23, 2026 · issued Jul 21, 2026 · Permit 25 108959 BLD (revision 01)
- Permit issued
Heating and ventilation
HVAC - Interior alterations to legalize existing single family dwelling into 4 units
Applied Dec 17, 2025 · issued Sep 8, 2026 · Permit 25 108959 HVA
- Permit issued
Small residential project · Multiple projects
Interior alterations to legalize existing single family dwelling into 4 units
Applied Jan 27, 2025 · issued Sep 15, 2025 · 4 homes added · Permit 25 108959 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Submitted
9 storeys · 60 homes · Residential
340 m away · Site plan · Submitted · filed Jul 29, 2026
- Approved
- Approved
- Under review
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
50 storeys · 588 homes · Residential
460 m away · Site plan · Under review · filed Mar 25, 2026
- Under appeal
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
37 storeys · 3,547 homes · Residential
460 m away · Rezoning · Under appeal · filed Apr 5, 2022
Neighbours’ Committee of Adjustment files within 250 m
1152 Dupont St · Minor variance
To permit a retail store use within the existing one-storey commercial building.
180 m away · filed Apr 27, 2026 · Approved
349 Bartlett Ave N · Minor variance
To construct a new three-storey semi-detached dwelling (including a basement with walkout) with front and rear porches with stairs, a rear second storey balcony, and front and rear third storey balconies. Also, to construct a new one-storey semi-detached ancillary building (including a basement with walkout) containing one garden suite. There will be a total of four residential dwelling units on this lot (three units within the main building, and one unit within the ancillary building).
240 m away · filed Nov 5, 2025 · Approved
347 Bartlett Ave N · Minor variance
To construct a new three-storey semi-detached dwelling (including a basement with walkout) with front and rear porches with stairs, a rear second storey balcony, and front and rear third storey balconies. Also, to construct a new one-storey semi-detached ancillary building (including a basement with walkout) containing one garden suite. There will be a total of four residential dwelling units on this lot (three units within the main building, and one unit within the ancillary building).
240 m away · filed Nov 5, 2025 · Approved
815 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by converting the existing front integral garage into habitable space. Also, to install a front yard parking pad (to replace the existing reverse slope driveway, which will be filled in), abutting Gladstone Avenue.
200 m away · filed Apr 17, 2025 · Application withdrawn
1170 Dupont St · Minor variance
To permit a car washing establishment use (located on the ground level of the existing two-storey commercial building) on this site.
220 m away · filed Feb 14, 2025 · Approved
220 Geary Ave · Minor variance
To permit a personal service shop use (barber studio to be located on the second storey of the existing two-storey building).
170 m away · filed Aug 1, 2024 · Approved
211 Geary Ave · Minor variance
To convert the existing two-storey commercial building from an eating establishment into a wellness centre (with a café) on the ground floor and second floor. Also, the existing front yard patio will be reconstructed and enlarged.
120 m away · filed May 30, 2024 · Approved
216 Geary Ave · Minor variance
To permit an outdoor patio and open storage area on the existing vacant lot (municipally known as 216 Geary Avenue), which will be in conjunction with the existing ground floor and mezzanine eating establishment (municipally known as 218 Geary Avenue). Also, to permit a front yard outdoor patio in conjunction with the existing ground floor and mezzanine eating establishment (municipally known as 218 Geary Avenue), and to convert the ground floor and mezzanine of the existing building (municipally know as 220 and 222 Geary Avenue) into two eating establishments, each with a front yard outdoor…
150 m away · filed Dec 19, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.