Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

296 Church St

The City of Toronto has 7 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Other

    Complete various retro-commissioning activities, HVAC and control systems repair & upgrade to optimize the performance of the building. Work includes replacing all aged heating equipment with the new ones and high efficiency convectors, upgrading the aged pneumatic control system and equipment with DDC ones complete with optimized sequence of control, and providing the DCV system.

    Applied Sep 15, 2021 · issued Oct 15, 2021 · Permit 21 212765 MSA

    Inspections under way
  • Addition or alteration · Other

    Proposal to reinforce existing timber framed columns and beams to existing university building.

    Applied Sep 14, 2017 · issued Sep 20, 2017 · completed Sep 3, 2019 · Permit 17 233007 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed alterations (187m2) to ground and third floor - Ryerson FCAD Fabrication Classrooms.

    Applied Apr 27, 2016 · issued May 30, 2016 · completed Jan 16, 2017 · Permit 16 146821 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing Ryerson Building (Interior Design School). Convenience address 302 Church St.

    Applied Nov 21, 2006 · issued Jan 9, 2007 · completed Aug 11, 2026 · Permit 06 192953 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing Ryerson Building (Interior Design School). Convenience address 302 Church St.

    Applied Nov 21, 2006 · issued Jan 9, 2007 · Permit 06 192953 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to portion of 2nd floor. Reconfigure WC ( add ) and classroom.

    Applied Aug 24, 2006 · issued Sep 1, 2006 · completed Aug 11, 2026 · Permit 06 169869 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to portion of 2nd floor. Reconfigure WC ( add ) and classroom.

    Applied Aug 24, 2006 · issued Sep 1, 2006 · completed Jul 21, 2017 · Permit 06 169869 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 241 Church Street

    53 storeys · 591 homes · Mixed use

    100 m away · Site plan · Approved · filed Aug 31, 2021

    Approved
  • 33 Dundas Street East

    Residential

    210 m away · Condominium · Under review · filed Oct 1, 2025

    Under review
  • 237 Victoria Street

    24 storeys · 256 homes · Residential

    240 m away · Site plan · Under review · filed Sep 1, 2022

    Under review
  • 335 Yonge Street

    Not stated in the file

    260 m away · Subdivision · Under review · filed Nov 8, 2021

    Under review
  • 295 Jarvis Street

    60 storeys · 618 homes · Residential

    280 m away · Site plan · Under review · filed Nov 15, 2022

    Under review
  • 56-66 Bond Street

    6 storeys · Residential

    310 m away · Site plan · Under review · filed Dec 1, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 145 Mutual St · Minor variance

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    220 m away · filed Aug 28, 2024 · Approved

  • 244 Church St · Minor variance

    To alter the development standards (approved by Site Specific Zoning By-law 517-2021 and 518-2021), for a 52-storey mixed-use building, with four levels of underground parking, by reducing the required retail/visitor parking spaces.

    170 m away · filed Oct 17, 2023 · Approved

  • 202 Jarvis St · Minor variance

    To construct a new 14-storey building (the 15th storey will be used for mechanical equipment) with a front third storey roof terrace, east and west side roof terraces on the third, fifth and seventh storey, a rear seventh storey roof terrace, and a complete roof terrace on the roof level. The mixed-use building will contain classroom spaces, faculty offices, and common areas for academic purposes.

    240 m away · filed May 23, 2023 · Approved

  • 137 Bond St · Minor variance

    To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.

    70 m away · filed Apr 6, 2023 · Approved

  • 244 Church St · Consent

    To obtain consent to create a new easement/right-of-way for pedestrian access.

    170 m away · filed Feb 27, 2023 · Approved

  • 65 Dundas St E · Minor variance

    To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.

    170 m away · filed Aug 16, 2022 · Approved

  • 111 Bond St · Minor variance

    To construct a new five-storey administrative building associated with Ryerson University.

    60 m away · filed May 22, 2020 · Withdrawn

  • 40 Gould St · Minor variance

    To construct cooling towers on the roof of an existing three-storey university building.

    120 m away · filed Feb 13, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.