Toronto address · Ward 14, Toronto-Danforth
299 Greenwood Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only)
Applied Jul 2, 2019 · issued Jul 2, 2019 · completed Jul 16, 2019 · Permit 19 181486 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1291-1311 Gerrard Street East and 243-247 Greenwood Avenue
12 storeys · 289 homes · Mixed use
190 m away · Site plan · Under review · filed May 4, 2023
- Under review
7 storeys · 19 homes · Mixed use
360 m away · Site plan · Under review · filed May 2, 2022
Neighbours’ Committee of Adjustment files within 250 m
1250 Gerrard St E · Minor variance
To alter the existing three-storey mixed-use rowhouse dwelling by constructing a rear three-storey addition with a basement walkout, and an exterior fire escape staircase leading to all the levels. Also, to construct one ground level office space, and four residential dwelling units within this dwelling. There will be a total of five bicycle parking spaces provided in the rear yard. The existing ground level commercial space (coin laundry facility) will be maintained and unaltered.
150 m away · filed Jan 8, 2026 · Approved
44 Sandford Ave · Minor variance
To legalize and to maintain a one-storey detached ancillary building (containing one laneway suite) in the rear yard, abutting the laneway. This ancillary building was constructed without an authorized building permit.
100 m away · filed Nov 12, 2025 · Approved
12 Sandford Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third-storey addition, and a front yard parking pad.
190 m away · filed Jun 18, 2025 · Approved
254 Greenwood Ave · Minor variance
To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the property, abutting Bloomfield Avenue. The existing shed will be demolished. There will be a total of four residential dwelling units on the lot (three dwelling units within the main house and one dwelling unit within the garden suite).
50 m away · filed Sep 17, 2024 · Withdrawn
52 Glenside Ave · Minor variance
To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing rear detached garage and dwelling will be demolished.
130 m away · filed Jun 21, 2024 · Approved
42 Sandford Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground level deck, and a front basement walkout entry and stairs. Also, to reconstruct the front enclosed porch and stairs. The existing rear ancillary building (detached garage) will be maintained and unaltered. There will be a total of two residential dwelling units on this lot.
100 m away · filed Mar 6, 2024 · Approved
21 Sandford Ave · Minor variance
To alter the existing detached two-and-one-half-storey dwelling by constructing a new rear first storey deck addition, a new swimming pool in the rear yard and a rear two-storey detached ancillary building (garage). The existing detached garage will be demolished.
160 m away · filed Nov 2, 2023 · Approved
88 Redwood Ave · Minor variance
To construct a new three-storey detached dwelling with a side (south) third storey terrace. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.
150 m away · filed Oct 25, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.