Toronto address · Ward 14, Toronto-Danforth
302 Pape Ave
The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Interior alterations
REVISION#1: REMOVE PROPOSED SECONDARY BASEMENT UNIT. Interior alterations to create a basement secondary suite with repairs to foundation and rear canopy
Applied Jun 22, 2021 · issued Jun 30, 2021 · Permit 21 108570 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Interior alterations to create a basement secondary suite with repairs to foundation and rear canopy
Applied Jan 25, 2021 · issued Mar 10, 2021 · Permit 21 108570 PLB
- Inspections under way
Small residential project · Second suite (New)
Interior alterations to create a basement secondary suite with repairs to foundation and rear canopy
Applied Jan 25, 2021 · issued Mar 10, 2021 · 1 home added · Permit 21 108570 BLD
- Inspections under way
Drains and site services
Drain - Interior alterations to create a basement secondary suite with repairs to foundation and rear canopy
Applied Jan 25, 2021 · issued Mar 10, 2021 · Permit 21 108570 DRN
- Closed (dormant)
Small residential project · Unknown
Alter plans as approved under appl.330492 by making interior alterations to basement for additional dwelling unit see c of a dec final ss
Applied Mar 26, 1993 · issued Apr 1, 1993 · completed Sep 18, 2026 · 2 homes added · Permit 93 014337 BLD (revision 01)
- Closed (dormant)
Plumbing · Unknown
Install 1 2-compt. Sink on 2nd floor. Cost included in 330492
Applied Dec 9, 1991 · issued Dec 27, 1991 · completed Sep 18, 2026 · Permit 91 025480 PLB
- Closed (dormant)
Small residential project · Unknown
Interior alterations.
Applied Dec 9, 1991 · issued Dec 13, 1991 · completed Sep 18, 2026 · 1 home added · Permit 91 025479 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
22 Badgerow Ave · Minor variance
To permit and maintain the existing front porch enclosure of the three-storey semi-detached dwelling, which was constructed beyond the limits of the approved building permit (24 150571 BLD 03 SR). There is a total of two residential dwelling units on this lot (one unit occupying the basement and first levels, and one unit occupying the second and third levels).
80 m away · filed Aug 28, 2026 · Hearing scheduled
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
240 m away · filed Jun 17, 2026 · Approved
137 Boston Ave · Minor variance
To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.
230 m away · filed Jul 17, 2025 · Approved
75 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.
200 m away · filed May 27, 2025 · Approved
1230 Dundas St E · Consent
To obtain consent to sever a portion of the lands within the existing building for a lot addition (stratified) and to maintain existing easements/rights-of-way. Note: 1230 and 1220 Dundas Street East are contiguous properties, under the same ownership and share a building envelope (with separate entrances) with modifiable demising walls. The adjacent property at 1210 Dundas Street East is occupied by Crow¿'s Theatre.
180 m away · filed Apr 23, 2025 · Approved
22 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a two-storey rear addition (with basement), a new rear basement walkout, as well as second and third storey rear decks.
80 m away · filed Jun 9, 2023 · Approved
318 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition, and a rear ground floor deck. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.
50 m away · filed Feb 9, 2023 · Approved
227 Pape Ave · Minor variance
To permit office use on the ground floor, which will be a secondary use to the existing residential use on the second floor that will remain. The basement will remain as storage use.
200 m away · filed Sep 12, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.