The City of Toronto has 7 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Building Alterations to New Toronto SPS as part of the forcemain replacement project includes: addition of several pipe supports and concrete thrust blocks. Wet well wall penetrations will be made to accommodate for new piping. Modification to benching in wet well. All process piping and valves will be replaced
Applied Nov 17, 2022 · issued Feb 28, 2023 · Permit 22 230541 HVA
- Permit issued
Plumbing
Plumbing - Building Alterations to New Toronto SPS as part of the forcemain replacement project includes: addition of several pipe supports and concrete thrust blocks. Wet well wall penetrations will be made to accommodate for new piping. Modification to benching in wet well. All process piping and valves will be replaced
Applied Nov 17, 2022 · issued Feb 28, 2023 · Permit 22 230541 PLB
- Permit issued
Addition or alteration · Interior alterations
Building Alterations to New Toronto SPS as part of the forcemain replacement project includes: addition of several pipe supports and concrete thrust blocks. Wet well wall penetrations will be made to accommodate for new piping. Modification to benching in wet well. All process piping and valves will be replaced
Applied Nov 17, 2022 · issued Feb 28, 2023 · Permit 22 230541 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposal to upgrade stand-by diesel generators and hvac
Applied May 27, 2013 · issued Oct 22, 2013 · Permit 13 175033 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal to upgrade stand-by diesel generators and hvac
Applied May 27, 2013 · issued Oct 22, 2013 · Permit 13 175033 HVA
- Inspections under way
Heating and ventilation
HVAC - Upgrades to existing municipal pumping station: work includes upgrading of HVAC system, replacement of existing process pumps, electrical upgrades to suite the new pumping equipment and various structural modifications (sealing the existing interior wetwell accessway and creating a new wetwell accessway, grating replacment, new floor/roof openings for exhaust fans and electrical wiring.)
Applied Sep 10, 2008 · issued Oct 24, 2008 · Permit 08 201438 HVA
- Inspections under way
Addition or alteration · Multiple projects
Upgrades to existing municipal pumping station: work includes upgrading of HVAC system, replacement of existing process pumps, electrical upgrades to suite the new pumping equipment and various structural modifications (sealing the existing interior wetwell accessway and creating a new wetwell accessway, grating replacment, new floor/roof openings for exhaust fans and electrical wiring.)
Applied Sep 9, 2008 · issued Oct 24, 2008 · Permit 08 201438 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Not stated in the file
250 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
13 Lake Shore Dr · Minor variance
To legalize and to maintain the dwelling currently under construction.
100 m away · filed Oct 30, 2025 · Approved
38 Third St · Minor variance
To construct a new duplex with an attached garage.
150 m away · filed Dec 27, 2024 · Approved
38 Third St · Minor variance
To construct a new duplex with an attached garage.
150 m away · filed Dec 27, 2024 · Approved
38 Third St · Consent
To obtain consent to sever the property into two undersized residential lots.
150 m away · filed Dec 24, 2024 · Approved
13 Lake Shore Dr · Minor variance
To construct a second storey addition above the existing dwelling, a two-storey front addition, a two-storey east side addition, and a new deck in the rear yard.
100 m away · filed Dec 20, 2024 · Approved
7 Lake Shore Dr · Minor variance
To constuct a two-storey rear addition, a second storey addition above the existing dwelling, and a new deck in the rear yard.
140 m away · filed Sep 16, 2024 · Approved
19 Second St · Minor variance
To construct a two-storey rear addition and a second storey addition above the existing dwelling.
110 m away · filed Jan 30, 2024 · Approved
45 Fourth St · Minor variance
To construct a two-storey front addition and a new front porch.
170 m away · filed Aug 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.