- Approved
Alternative solution
Proposal for an alternative solution to address spatial separation exposure protection for the curved glazing along the south exposing building face of the 2-6 floors utilizing modified sprinklered window protection with strategically located sprinkler heads
Applied Jan 15, 2026 · completed May 26, 2026 · Permit 26 105048 ALT
- Revision issued
New building
Revision 1: 19 to 17 unitsProposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Jan 12, 2026 · issued Jul 27, 2026 · Permit 21 225092 BLD (revision 01)
- Revision issued
Heating and ventilation
Revision 1: HVAC - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Jan 12, 2026 · issued Jun 1, 2026 · Permit 21 225092 HVA (revision 01)
- Revision issued
Plumbing
Revision 1: Plumbing - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Jan 12, 2026 · issued Jun 1, 2026 · Permit 21 225092 PLB (revision 01)
- Closed
Conditional permit
This Folder was closed by the system. CP child folders cannot be created using the 'Create Child' button.The parentRSN was: 5432627
Applied May 28, 2024 · completed May 28, 2024 · Permit 24 155520 000
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied May 3, 2024 · issued Dec 13, 2024 · completed Feb 10, 2025 · Permit 21 225092 STR
- Superseded
Partial permit · Partial permit - foundation
Part Permit - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Jul 31, 2023 · completed Jul 9, 2024 · Permit 21 225092 FND
- Closed
Partial permit · Partial permit - foundation
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 5008989
Applied Jul 28, 2023 · completed Jul 28, 2023 · Permit 23 181187 000
- Closed
Partial permit · Partial permit - foundation
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 5008989
Applied Jul 28, 2023 · completed Jul 28, 2023 · Permit 23 181195 000
- Cancelled
Conditional permit · Partial permit - shoring
Conditional Permit - Part Permit - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Mar 11, 2022 · issued May 11, 2022 · completed Oct 13, 2023 · Permit 21 225092 SHO
- Approved
Alternative solution
Alternative Solution for providing 65 mm diameter standpipe hose valves withing the exit stairs (and as required on the floor areas for coverage purposes) in lieu of traditional fire hose cabinets (containing 38mm and 65 mm diameter hose connections as well as 30 m of fire hose) for the residential building to be located at 321 Davenport Road. This correspondens has been prepard with respect to the fire and life safety requiremetn in Part 3 of the 2012 Ontario Building Code (OBC, O. Reg 332/12 as amended to O.Reg 762/20 - as read prior to January 1, 2022) as well as the Alternative Solution P…
Applied Jan 15, 2022 · completed Apr 12, 2022 · Permit 22 104347 ALT
- Inspections under way
Plumbing
Plumbing - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Oct 13, 2021 · issued Aug 20, 2024 · Permit 21 225092 PLB
Show 5 more permits
- Inspections under way
Drains and site services
Drain - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Oct 13, 2021 · issued Jan 8, 2024 · Permit 21 225092 DRN
- Inspections under way
New building
Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Oct 13, 2021 · issued Feb 10, 2025 · 17 homes added · Permit 21 225092 BLD
- Permit issued
Drains and site services · Inside and outside drains
Drain - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Oct 13, 2021 · issued Feb 10, 2025 · Permit 21 225092 STS
- Inspections under way
Heating and ventilation
HVAC - Proposal to demolish the existing building and construct a new 9 storey apartment building with 4 levels of underground parking garage.
Applied Oct 13, 2021 · issued Dec 16, 2024 · Permit 21 225092 HVA
- Closed
Demolition
Proposal to demolish the existing industrial building for a new development (19 203460 STE 11 SA)
Applied Oct 6, 2021 · issued Dec 9, 2021 · completed Jun 15, 2026 · Permit 21 222643 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 23 homes · Residential
10 m away · Condominium · Under review · filed Oct 28, 2021
- Approved
141-145 Bedford Road and 287 Davenport Road
13 storeys · 63 homes · Mixed use
140 m away · Site plan · Approved · filed Dec 14, 2021
- Under appeal
18 storeys · 121 homes · Residential
210 m away · Rezoning · Under appeal · filed Jan 8, 2025
- Approved
- Under review
220-234 Davenport Road and 148-158 Avenue Road
38 storeys · 110 homes · Mixed use
310 m away · Site plan · Under review · filed Jul 2, 2021
- Approved
11 storeys · 60 homes · Mixed use
340 m away · Rezoning · Approved · filed Mar 2, 2023
Neighbours’ Committee of Adjustment files within 250 m
250 Davenport Rd · Minor variance
240 m away · filed Aug 20, 2026 · Postponed
247 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
200 m away · filed Oct 1, 2025 · Approved
249 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
210 m away · filed Oct 1, 2025 · Approved
115 Dupont St · Minor variance
To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).
130 m away · filed Sep 24, 2025 · Postponed
287 Davenport Rd · Minor variance
To alter the development standards for a 13-storey mixed-use building (as approved under Site Specific Zoning By-law 314-2023), by increasing the total non-residential gross floor area on the lot. A Site Plan Control application (File Number 21 248545 STE 11 SA) is currently under review.
140 m away · filed Aug 28, 2025 · Approved
312 St George St · Minor variance
To convert the existing three-storey semi-detached dwelling into a multi-tenant house containing 12 dwelling rooms. Also, to construct a rear third storey terrace, a rear three-storey exit staircase, and a rear basement walkout.
200 m away · filed Feb 21, 2025 · Refused
60 Bernard Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor addition with a terrace above.
120 m away · filed May 2, 2024 · Approved
124 Bedford Rd · Minor variance
To alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition to contain one garden suite. The two-car integral parking spaces will be maintained and unaltered.
240 m away · filed Dec 1, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.