Toronto address · Ward 3, Etobicoke-Lakeshore
33 Third St
The City of Toronto has 7 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - To constuct second floor addtion, interior alterations, basement underpinning and basement alterations and rear deck
Applied May 24, 2023 · issued Jun 22, 2023 · Permit 22 176000 HVA
- Revision issued
Small residential project · Multiple projects
Reviosion 01: Proposal of replacing joists on first floor and changing wood deck to concreteTo constuct second floor addtion, interior alterations, basement underpinning and basement alterations and rear deck
Applied Jan 27, 2023 · issued Feb 15, 2023 · Permit 22 176000 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - To constuct second floor addtion, interior alterations, basement underpinning and basement alterations and rear deck
Applied Jul 13, 2022 · issued Sep 28, 2022 · Permit 22 176000 PLB
- Inspections under way
Small residential project · Multiple projects
To constuct second floor addtion, interior alterations, basement underpinning and basement alterations and rear deck
Applied Jul 13, 2022 · issued Sep 27, 2022 · Permit 22 176000 BLD
- Closed
Drains and site services
Drain - To constuct second floor addtion, interior alterations, basement underpinning and basement alterations and rear deck
Applied Jul 13, 2022 · issued Sep 28, 2022 · completed Jan 18, 2024 · Permit 22 176000 DRN
- Closed
Heating and ventilation
HVAC - One storey rear addition, also rear deck to single family dwelling.
Applied Dec 18, 2007 · issued Jan 24, 2008 · completed May 23, 2023 · Permit 07 287736 HVA
- Closed
Plumbing
Plumbing - One storey rear addition, also rear deck to single family dwelling.
Applied Dec 18, 2007 · issued Jan 24, 2008 · completed May 23, 2023 · Permit 07 287736 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To construct a two-storey addition above the existing dwelling and a two-storey rear addition.
Decision: Approved (hearing Apr 21, 2022)
Filed Feb 8, 2022 · File A0147/22EYK
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Not stated in the file
170 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
13 Lake Shore Dr · Minor variance
To legalize and to maintain the dwelling currently under construction.
150 m away · filed Oct 30, 2025 · Approved
38 Third St · Minor variance
To construct a new duplex with an attached garage.
50 m away · filed Dec 27, 2024 · Approved
38 Third St · Minor variance
To construct a new duplex with an attached garage.
50 m away · filed Dec 27, 2024 · Approved
38 Third St · Consent
To obtain consent to sever the property into two undersized residential lots.
50 m away · filed Dec 24, 2024 · Approved
13 Lake Shore Dr · Minor variance
To construct a second storey addition above the existing dwelling, a two-storey front addition, a two-storey east side addition, and a new deck in the rear yard.
150 m away · filed Dec 20, 2024 · Approved
7 Lake Shore Dr · Minor variance
To constuct a two-storey rear addition, a second storey addition above the existing dwelling, and a new deck in the rear yard.
190 m away · filed Sep 16, 2024 · Approved
19 Second St · Minor variance
To construct a two-storey rear addition and a second storey addition above the existing dwelling.
120 m away · filed Jan 30, 2024 · Approved
118 Fifth St · Minor variance
To legalize and to maintain the garden suite that is currently under construction.
250 m away · filed Dec 4, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.