Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

342 Davenport Rd

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Shoring

    Proposal for standalone shoring to install piling only. Permit in correlation with 18-162779 for soil remediation.

    Applied Jan 31, 2019 · completed Mar 27, 2019 · Permit 19 110355 BLD

    Cancelled
  • Addition or alteration · Shoring

    Proposal for standalone shoring and excavation in preparation for RSC for the construction of a 9-storey mixed-use condo building including retail at grade and 3 levels of underground parking.

    Applied May 22, 2018 · completed Nov 20, 2019 · Permit 18 162779 BLD

    Cancelled
  • Demolition

    Proposal for demolition of a 2.5 storey mixed use building

    Applied Sep 25, 2017 · issued May 11, 2018 · completed Apr 21, 2020 · 1 home removed · Permit 17 238310 DEM

    Closed
  • Designated structure · Sign building permit related

    Install 1 First Party Ground sign

    Applied Mar 9, 2016 · issued Mar 23, 2016 · completed Apr 15, 2019 · Permit 16 118307 DST

    Closed
  • Addition or alteration · Other

    Administrative permit related to construction at 346 Davenport 15-195658

    Applied Jul 23, 2015 · issued Oct 16, 2015 · Permit 15 195699 BLD

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 250 Davenport Rd · Minor variance

    250 m away · filed Aug 20, 2026 · Postponed

  • 249 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    150 m away · filed Oct 1, 2025 · Approved

  • 247 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    140 m away · filed Oct 1, 2025 · Approved

  • 115 Dupont St · Minor variance

    To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).

    60 m away · filed Sep 24, 2025 · Postponed

  • 287 Davenport Rd · Minor variance

    To alter the development standards for a 13-storey mixed-use building (as approved under Site Specific Zoning By-law 314-2023), by increasing the total non-residential gross floor area on the lot. A Site Plan Control application (File Number 21 248545 STE 11 SA) is currently under review.

    180 m away · filed Aug 28, 2025 · Approved

  • 312 St George St · Minor variance

    To convert the existing three-storey semi-detached dwelling into a multi-tenant house containing 12 dwelling rooms. Also, to construct a rear third storey terrace, a rear three-storey exit staircase, and a rear basement walkout.

    200 m away · filed Feb 21, 2025 · Refused

  • 60 Bernard Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor addition with a terrace above.

    190 m away · filed May 2, 2024 · Approved

  • 115 Dupont St · Minor variance

    To alter the five-storey office building, abutting the laneway, approved in OMB Decision MM160069 (Case No. PL170944) by reducing the height of the first storey.

    60 m away · filed Sep 12, 2023 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.