Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

354 Wallace Ave

The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Remodelling existing bathroom on the second floor. Keeping all rough-ins in the same spot. Basement bathroom will be added. Rough-ins are already there, will need to add a shower drain rough in. Currently used as a laundry, will be converted into laundry plus bathroom. No structural changes. Currently have a plumbing permit for the site but inspector asked us to get a building permit as well. Permit # - 26 133726 PSA 00 PS

    Applied Apr 28, 2026 · issued May 1, 2026 · Permit 26 151200 BLD

    Inspections under way
  • Plumbing

    Plumbing - Remodelling existing bathroom on the second floor. Keeping all rough-ins in the same spot. Basement bathroom will be added. Rough-ins are already there, will need to add a shower drain rough in. Currently used as a laundry, will be converted into laundry plus bathroom. No structural changes. Currently have a plumbing permit for the site but inspector asked us to get a building permit as well. Permit # - 26 133726 PSA 00 PS

    Applied Apr 28, 2026 · issued May 1, 2026 · Permit 26 151200 PLB

    Inspections under way
  • Plumbing

    Plumbing - Alterations to the second floor washroom, new washroom in the basement with existing laundry

    Applied Apr 16, 2026 · completed Apr 17, 2026 · Permit 26 145335 PLB

    Cancelled
  • Plumbing · Other

    Proposal for Relocation of kitchen sink and dishwasher as per new proposed drawings provided by client and interior designer. Relocation of the vanity plumbing and toilet in the connecting powder room. Uptairs plumbing rough in to stay the same. Downstairs laundry to be converted into bathroom and laundry combo, rough in are existing.

    Applied Mar 24, 2026 · issued Apr 1, 2026 · Permit 26 133726 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 261 Perth Ave · Minor variance

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    140 m away · filed Jul 7, 2026 · Approved

  • 2440 Dundas St W · Minor variance

    To alter the development standards for the 37-storey mixed-use building (Phase 1, north portion of the site) (approved under Site Specific Zoning By-Law 1419-2024), by increasing the height of the tower (Tower A) by 1 m and stepped podium heights by an additional 0.7 m - 2.9 m, and reducing the minimum required percentage of three-bedroom dwelling units. Phase I will have a minimum of 3,200 m² of gross floor area for permitted non-residential uses of which 1,850 m² will be for a a grocery store. There will be a total of 421 residential dwelling units within this building (Phase 1), on the lot…

    230 m away · filed Mar 26, 2026 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    190 m away · filed Nov 7, 2024 · Approved

  • 2440 Dundas St W · Consent

    To obtain consent to sever the lot into two lots for a mixed-use phased development and to maintain an existing easement/right-of-way.

    230 m away · filed Jul 5, 2024 · Approved

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    160 m away · filed Aug 8, 2023 · Approved

  • 130 Symington Ave · Minor variance

    To construct a two-storey rear addition, a front basement walkout and a rear yard deck,

    210 m away · filed Jul 27, 2022 · Approved

  • 371 Wallace Ave · Minor variance

    To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.

    80 m away · filed Apr 19, 2022 · Approved

  • 315 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    240 m away · filed Apr 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.