Toronto address · Ward 9, Davenport
37 Macaulay Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01. HVAC - Structural fire damage restoration to existing dwelling
Applied Mar 24, 2022 · issued Mar 30, 2022 · completed Oct 14, 2022 · Permit 21 176288 HVA (revision 01)
- Closed
Small residential project · Fire damage
Revision 01. Structural fire damage restoration to existing dwelling
Applied Nov 6, 2021 · issued Nov 17, 2021 · completed Sep 26, 2025 · Permit 21 176288 BLD (revision 01)
- Closed
Plumbing
Plumbing - Structural fire damage restoration to existing dwelling
Applied Oct 25, 2021 · issued Oct 25, 2021 · completed Oct 31, 2022 · Permit 21 176288 PLB
- Closed
Heating and ventilation
HVAC - Structural fire damage restoration to existing dwelling
Applied Sep 1, 2021 · issued Sep 29, 2021 · completed Oct 14, 2022 · Permit 21 176288 HVA
- Closed
Small residential project · Fire damage
Structural fire damage restoration to existing dwelling
Applied Jun 26, 2021 · issued Jul 7, 2021 · completed Sep 26, 2025 · Permit 21 176288 BLD
- Closed
Small residential project · Other
Proposal to repair existing foundation of semi-detached residential building.
Applied Mar 14, 2016 · issued Mar 18, 2016 · completed Mar 20, 2026 · Permit 16 127551 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
29 storeys · 288 homes · Mixed use
240 m away · Site plan · Under review · filed Jul 25, 2024
- Under review
42 storeys · 56 homes · Not stated in the file
330 m away · Site plan · Under review · filed Jun 27, 2025
Neighbours’ Committee of Adjustment files within 250 m
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
150 m away · filed Jul 7, 2026 · Approved
2440 Dundas St W · Minor variance
To alter the development standards for the 37-storey mixed-use building (Phase 1, north portion of the site) (approved under Site Specific Zoning By-Law 1419-2024), by increasing the height of the tower (Tower A) by 1 m and stepped podium heights by an additional 0.7 m - 2.9 m, and reducing the minimum required percentage of three-bedroom dwelling units. Phase I will have a minimum of 3,200 m² of gross floor area for permitted non-residential uses of which 1,850 m² will be for a a grocery store. There will be a total of 421 residential dwelling units within this building (Phase 1), on the lot…
250 m away · filed Mar 26, 2026 · Approved
182 Symington Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.
200 m away · filed Nov 7, 2024 · Approved
2440 Dundas St W · Consent
To obtain consent to sever the lot into two lots for a mixed-use phased development and to maintain an existing easement/right-of-way.
250 m away · filed Jul 5, 2024 · Approved
5 Ruskin Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.
130 m away · filed Aug 8, 2023 · Approved
2531 Dundas St W · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
230 m away · filed Nov 14, 2022 · Approved
130 Symington Ave · Minor variance
To construct a two-storey rear addition, a front basement walkout and a rear yard deck,
250 m away · filed Jul 27, 2022 · Approved
371 Wallace Ave · Minor variance
To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.
100 m away · filed Apr 19, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.