Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

375R Queen St W

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display one non-illuminated wall sign.****INKBOX****

    Applied Jul 30, 2019 · completed May 6, 2020 · Permit 19 198084 DST

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alterations to retail space (Ink Box)

    Applied May 16, 2019 · issued Jun 5, 2019 · completed Aug 14, 2019 · Permit 19 155458 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 336 Queen St W · Minor variance

    To permit an entertainment facility-related use (interactive game show experience) located within a portion of the first storey of the existing four-storey building, in addition to the existing restaurant use (as approved under Building Permit 20 118020 BLD 00 BA) and existing recreational use (place of amusement, as approved under Minor Variance Decision A0903/23TEY). The existing office uses located on the second to fourth storeys will be maintained.

    110 m away · filed Jun 26, 2026 · Approved

  • 117 Peter St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 663-2011), for an existing 36-storey mixed-use building, by enclosing the north side outdoor patio for the eating establishment (restaurant).

    110 m away · filed May 5, 2026 · Approved

  • 333 Queen St W · Minor variance

    To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.

    180 m away · filed Jan 27, 2026 · Approved

  • 52 Phoebe St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).

    250 m away · filed Jan 12, 2026 · Approved

  • 298 Queen St W · Minor variance

    To convert the existing three-storey semi-detached mixed-use building (residential and office uses) into a hotel use containing 22 rooms. The existing basement and ground floor restaurant will be maintained and unaltered.

    110 m away · filed Dec 19, 2025 · Approved

  • 50 Phoebe St · Minor variance

    To construct a front basement walkout with stairs.

    250 m away · filed Nov 19, 2024 · Approved

  • 128 Peter St · Minor variance

    To alter the development standards for the 40-storey mixed-use building (approved under Site Specific Zoning By-Law 1165-2022(OLT)), by increasing the residential gross floor area, reducing outdoor amenity space, and removing residential parking spaces.

    80 m away · filed May 1, 2024 · Approved

  • 102 Peter St · Consent

    To obtain consent to create a new easement/right-of-way for vehicle access (construction trucks, garbage disposal trucks, and those vehicles used for commercial purposes).

    150 m away · filed Nov 16, 2023 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.