Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

396 Lake Promenade

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal to construct interior alterations in the basement and underpinning

    Applied Mar 15, 2024 · issued Mar 15, 2024 · completed Sep 13, 2024 · Permit 22 240931 DRN

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alterations in the basement and underpinning

    Applied Jan 29, 2024 · issued Mar 12, 2024 · completed Sep 13, 2024 · Permit 22 240931 PLB

    Closed
  • Small residential project · Multiple projects

    Revision #01 - Two new windows at south wall of the basement and a new window at the west wall of the basementProposal to construct interior alterations in the basement and underpinning

    Applied Jan 29, 2024 · issued Feb 9, 2024 · completed Sep 13, 2024 · Permit 22 240931 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Proposal to construct interior alterations in the basement and underpinning

    Applied Dec 19, 2022 · issued Jun 16, 2023 · completed Sep 13, 2024 · Permit 22 240931 BLD

    Closed
  • Heating and ventilation

    HVAC - Construct interior alteraitons to main floor, remove two load bearing walls

    Applied Sep 14, 2021 · issued Oct 19, 2021 · completed Sep 13, 2024 · Permit 21 207960 HVA

    Closed
  • Small residential project · Interior alterations

    Construct interior alteraitons to main floor, remove two load bearing walls

    Applied Sep 2, 2021 · issued Oct 19, 2021 · completed Sep 13, 2024 · Permit 21 207960 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 352 Lake Promenade · Minor variance

    To legalize and to maintain an existing garage that has been extended and converted into habitable space, to construct a two-storey rear addition, and a deck in the rear yard.

    200 m away · filed May 29, 2026 · Approved

  • 398 Lake Promenade · Minor variance

    To legalize and maintain the existing front balcony.

    20 m away · filed May 20, 2025 · Approved

  • 350 Lake Promenade · Minor variance

    To construct a new duplex.

    220 m away · filed Dec 13, 2024 · Approved

  • 9 Garden Pl · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Mar 26, 2024 · Withdrawn

  • 9 Garden Pl · Consent

    To obtain consent to sever the property into two undersized residential lots.

    190 m away · filed Mar 26, 2024 · Withdrawn

  • 9 Garden Pl · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Mar 26, 2024 · Withdrawn

  • 23 Garden Pl · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Dec 21, 2023 · Approved

  • 65 Fortieth St · Minor variance

    To construct a new fourplex.

    250 m away · filed Sep 20, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.