Toronto address · Ward 3, Etobicoke-Lakeshore
42 Culnan Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
REV01: Revision to permit 19-231995 BLD as per bubbled area. Construct new cold room under front porch.Proposal to construct a second storey addition, rear and side two storey addition, partial underpinning, and interior alterations to existing two-storey detached dwelling.
Applied Dec 10, 2019 · issued Dec 17, 2019 · completed Jul 28, 2021 · Permit 19 231995 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposeal to construct a second storey addition, rear and side two storey addition, partial underpinning, and interior alterations to existing two-storey detached dwelling.
Applied Oct 23, 2019 · issued Nov 6, 2019 · completed Feb 19, 2021 · Permit 19 231995 HVA
- Closed
Plumbing
Plumbing - Proposeal to construct a second storey addition, rear and side two storey addition, partial underpinning, and interior alterations to existing two-storey detached dwelling.
Applied Oct 8, 2019 · issued Oct 23, 2019 · completed Mar 5, 2021 · Permit 19 231995 PLB
- Closed
Drains and site services
Drain - Proposeal to construct a second storey addition, rear and side two storey addition, partial underpinning, and interior alterations to existing two-storey detached dwelling.
Applied Oct 8, 2019 · issued Oct 23, 2019 · completed Mar 5, 2021 · Permit 19 231995 DRN
- Closed
Small residential project · Multiple projects
Proposeal to construct a second storey addition, rear and side two storey addition, partial underpinning, and interior alterations to existing two-storey detached dwelling.
Applied Oct 4, 2019 · issued Oct 23, 2019 · completed Jul 28, 2021 · Permit 19 231995 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey rear and south side addition which will include an integral garage.
Decision: Approved (hearing Feb 7, 2019)
Filed Dec 11, 2018 · File A0908/18EYK
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
- Under review
46 storeys · Mixed use
470 m away · Site plan · Under review · filed Sep 9, 2021
Neighbours’ Committee of Adjustment files within 250 m
39 Trueman Ave · Minor variance
To construct a new detached garage in the rear yard.
140 m away · filed Aug 11, 2026 · Approved
17 Culnan Ave · Minor variance
To construct a new detached dwelling with an attached garage.
160 m away · filed Feb 27, 2026 · Approved
34 Trueman Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front porch, and a new deck in the rear yard.
90 m away · filed Nov 27, 2025 · Approved
20 Culnan Ave · Minor variance
To construct a new detached dwelling that will contain a secondary suite.
140 m away · filed Nov 29, 2023 · Approved
33 Brawley Ave · Minor variance
To construct a new one-storey front addition.
240 m away · filed Sep 18, 2023 · Approved
12 Stock Ave · Minor variance
To construct a new detached dwelling with an attached garage.
220 m away · filed Oct 22, 2022 · Approved
62 Stock Ave · Minor variance
To construct a new detached dwelling with an attached garage.
160 m away · filed Apr 22, 2022 · Approved
50 Brawley Ave · Minor variance
To construct a one-storey garage addition along the south side of the dwelling, a complete second storey addition, a partial third storey addition, a rear yard deck, a new second floor rear balcony, and a third floor rooftop deck.
200 m away · filed Feb 11, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.