Toronto address · Ward 14, Toronto-Danforth
43 Cummings St
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new three (3) storey townhouse (Part 1, 43A).
Applied Feb 9, 2021 · issued Jul 7, 2021 · completed Oct 30, 2025 · Permit 21 114718 HVA
- Closed
Plumbing
Plumbing - To demolish existing dwelling and construct a new three (3) storey townhouse (Part 1, 43A).
Applied Feb 9, 2021 · issued Jul 7, 2021 · completed Oct 30, 2025 · Permit 21 114718 PLB
- Closed
New house · New building
To demolish existing dwelling and construct a new three (3) storey townhouse with finished basement. (Part 1, 43A).
Applied Feb 9, 2021 · issued Jun 9, 2021 · completed Nov 6, 2025 · 1 home added · Permit 21 114718 BLD
- Closed
Demolition
Proposed to demolish the existing single storey detached dwelling.
Applied Feb 9, 2021 · issued Jun 21, 2021 · completed Aug 16, 2021 · 1 home removed · Permit 21 114723 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new three (3) storey townhouse (Part 1, 43A).
Applied Feb 9, 2021 · issued Jul 7, 2021 · completed Oct 30, 2025 · Permit 21 114718 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
6 storeys · 15 homes · Mixed use
360 m away · Site plan · Approved · filed Apr 28, 2023
Neighbours’ Committee of Adjustment files within 250 m
195 De Grassi St · Minor variance
To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.
230 m away · filed May 20, 2026 · Approved
162 Boulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.
250 m away · filed Apr 17, 2026 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling.
130 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
130 m away · filed Jan 24, 2024 · Approved
1000 Dundas St E · Minor variance
To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.
150 m away · filed Sep 15, 2023 · Approved
176 De Grassi St · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear three-storey addition, a third storey walkout deck, and a rear ground level deck.
210 m away · filed May 4, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.