Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

46 Northumberland St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Back Water Valve (Sewer only)

    Applied Sep 13, 2016 · issued Sep 13, 2016 · completed Feb 7, 2017 · Permit 16 222094 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 798 Dovercourt Road

    Residential

    100 m away · Condominium · Approved · filed Nov 14, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 800 Dovercourt Rd · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.

    100 m away · filed Jul 13, 2026 · Hearing scheduled

  • 942 Bloor St W · Minor variance

    To construct a new three-storey mixed-use building (the foundation of the existing building will be maintained), with eight third storey side (west) juliet balconies. There will be three commercial units that will occupy the ground floor and basement, and four residential dwelling units that will occupy the second and third storeys of the building on the lot.

    150 m away · filed Dec 1, 2025 · Approved

  • 225 Delaware Ave · Minor variance

    To convert the existing four-storey detached dwelling from a fourplex into a six unit apartment building by constructing a front and a rear fourth storey addition with balconies, and two enclosed rooftop stair access structures leading to private rooftop terraces, along with interior alterations. The existing rear ancillary building (garden suite) will be maintained and unaltered. There will be a total of seven residential dwelling units on this lot (six units within the main apartment building and one unit within the ancillary building).

    80 m away · filed Jun 12, 2025 · Deferred

  • 238 Delaware Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard of the property, abutting the private laneway.

    40 m away · filed May 13, 2025 · Approved

  • 301 Delaware Ave · Minor variance

    To permit the existing rear third storey addition, which was constructed without an authorized building permit.

    220 m away · filed May 2, 2024 · Approved

  • 386 Concord Ave · Minor variance

    To construct a new two-storey laneway suite.

    230 m away · filed Jan 26, 2024 · Approved

  • 373 Concord Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck. The rear two-storey addition will replace the existing rear one-storey addition and the rear second storey addition will be cantilevered on the south side of the altered dwelling.

    210 m away · filed Jan 23, 2024 · Approved

  • 980 Bloor St W · Minor variance

    To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 604-2022 ), by increasing the overall building height, density, and number of storeys from 11 to 13 storeys. Also, to reduce the development standards for required amenity space from 468 m2 to 453 m2, to reduce the required number of resident parking spaces from 52 to 42, and to alter the required dimensions of bicycle parking spaces.

    150 m away · filed Jan 15, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.