Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

48 Day Ave

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Porch

    Remove and replace covered concrete front porch with cold room

    Applied Oct 29, 2012 · issued Oct 31, 2012 · completed Feb 2, 2018 · Permit 12 269789 BLD

    Closed
  • Small residential project · Addition(s)

    Make alterations and construct 2nd floor addition at rear.see 02 - 195925 for plans

    Applied Dec 13, 2002 · issued Dec 19, 2002 · Permit 02 195929 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 133 Boon Ave · Minor variance

    To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).

    160 m away · filed Jun 4, 2026 · Approved

  • 75 Sellers Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).

    140 m away · filed Nov 4, 2025 · Approved

  • 95 Day Ave · Minor variance

    To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.

    150 m away · filed Jan 13, 2025 · Approved

  • 86 Day Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.

    110 m away · filed Jun 12, 2024 · Approved

  • 1966 Dufferin St · Minor variance

    To construct a new two-storey ancillary building (laneway suite with cantilevered second storey on the west side), in the rear yard, abutting the laneway. The existing ancillary building (detached garage) will be demolished. The existing detached two-and-one-half-storey main dwelling on the lot will remain unaltered.

    250 m away · filed Jan 22, 2024 · Approved

  • 44 Morrison Ave · Minor variance

    To legalize and to maintain the rear one-storey addition to the existing one-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.

    250 m away · filed Jun 7, 2023 · Approved

  • 142 Earlscourt Ave · Minor variance

    To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.

    210 m away · filed Jun 1, 2023 · Approved

  • 17 Day Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition and new stairs.

    110 m away · filed Apr 25, 2023 · Withdrawn

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.