Toronto address · Ward 9, Davenport
48 Macaulay Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct 2-storey dwelling with finished basement. Single family dwelling - Detached House.
Applied Dec 8, 2016 · issued Dec 14, 2016 · completed Nov 9, 2017 · Permit 16 151989 HVA
- Closed
Plumbing
Plumbing - Proposal to construct 2-storey dwelling with finished basement.
Applied May 9, 2016 · issued May 25, 2016 · completed Nov 9, 2017 · Permit 16 151989 PLB
- Closed
New house · New building
Proposal to construct 2-storey dwelling with finished basement. Single family dwelling - Detached House.
Applied May 9, 2016 · issued May 25, 2016 · completed Nov 9, 2017 · 1 home added · Permit 16 151989 BLD
- Closed
Demolition
Proposal to demolish existing dwelling.
Applied May 9, 2016 · issued May 25, 2016 · completed Nov 9, 2017 · 1 home removed · Permit 16 151998 DEM
- Closed
Drains and site services
Drain - Proposal to construct 2-storey dwelling with finished basement.
Applied May 9, 2016 · issued May 25, 2016 · completed Nov 9, 2017 · Permit 16 151989 DRN
- Cancelled
Small residential project · Other
Proposal for repair/reconstruction of damaged foundation wall. Damage is result of neighbouring condo construction. Refer to related Order to Remedy Unsafe Building.
Applied Apr 7, 2015 · issued Apr 10, 2015 · completed Jan 18, 2018 · Permit 15 137191 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
29 storeys · 288 homes · Mixed use
240 m away · Site plan · Under review · filed Jul 25, 2024
- Under review
42 storeys · 56 homes · Not stated in the file
360 m away · Site plan · Under review · filed Jun 27, 2025
- Under review
1650-1664 Dupont Street and 3 Osler Street
6 storeys · 28 homes · Mixed use
440 m away · Site plan · Under review · filed Aug 16, 2021
Neighbours’ Committee of Adjustment files within 250 m
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
210 m away · filed Jul 7, 2026 · Approved
12 Abbott Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, a rear one and two-storey additions (with a green rooftop above the rear one-storey addition), and a rear basement window well with a rear canopy above.
220 m away · filed May 24, 2024 · Approved
9 Glenlake Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition.
250 m away · filed Feb 21, 2024 · Approved
5 Ruskin Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.
140 m away · filed Aug 8, 2023 · Approved
2531 Dundas St W · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
160 m away · filed Nov 14, 2022 · Approved
371 Wallace Ave · Minor variance
To alter the existing four-storey apartment building by constructing a one-storey addition above the three-storey portion of this building, for Unit 28. The existing rooftop deck will be maintained.
150 m away · filed Apr 19, 2022 · Approved
317 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.
230 m away · filed Apr 11, 2022 · Approved
315 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.
240 m away · filed Apr 11, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.