Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

48 Stewart St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Admin partywall permit in conjunction with 14 186863 BLD, 46 Stewart St.

    Applied Aug 18, 2014 · issued Aug 29, 2014 · completed Nov 26, 2020 · Permit 14 207770 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 675 King St W · Consent

    To obtain consent to create a new stratified easement/right-of-way. This stratified easement/right-of-way is a height between grade and 6.1 m for a future cantilevered structure above.

    130 m away · filed Feb 2, 2026 · Approved

  • 578 King St W · Minor variance

    To alter the development standards for the nine-storey office building, as approved under Site Specific By-law 718-2025 (OLT), by converting to a hotel and retail use, constructing an interstitial level at the second storey, increasing the number of storeys to 11 storeys (with a building height of 43.39 m, inclusive of the mechanical penthouse), and increasing the non-residential gross floor area for this lot (6,273.5 square metres). This site has heritage designation. A Site Plan Control application (File Number 22 242134 STE 10 SA ) is currently under review.

    230 m away · filed Nov 18, 2025 · Postponed

  • 689 King St W · Consent

    To obtain consent to create a new stratified easement/right-of-way. This stratified easement/right-of-way has a height that varies from 4.4 m to 6.1 from grade, for a future cantilevered structure above.

    150 m away · filed Apr 8, 2025 · Approved

  • 54 Stewart St · Consent

    To obtain consent for the technical severance of the property for the purposes of re-establishing two residential lots which merged on title, as well as maintaining existing easements/rights-of-way.

    20 m away · filed Jan 19, 2024 · Approved

  • 575 Wellington St W · Minor variance

    To permit the extension of the existing lawful non-conforming live/work unit on the second storey of the two-storey mixed-use building, by constructing a rear second storey addition and a rear rooftop deck.

    190 m away · filed Aug 9, 2023 · Approved

  • 582 King St W · Minor variance

    To amend the development standards for the redevelopment of the site (as approved under Site Specific Zoning By-law 1116-2022 OLT) to permit an eating establishment use on this site.

    210 m away · filed Jul 21, 2023 · Approved

  • 577 Wellington St W · Minor variance

    To alter the existing two-storey non-residential building by constructing third and fourth storey additions, with a rear third storey roof deck.

    190 m away · filed Feb 6, 2023 · Approved

  • 575 Adelaide St W · Minor variance

    To alter the existing 11-storey residential building by constructing new hardscape accessible amenities, walkways, and softscape areas.

    200 m away · filed Jan 10, 2023 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.