Toronto address · Ward 3, Etobicoke-Lakeshore
48 Symons St
The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Construct a new two storey rear addition, a new rear yard ground floor deck, interior alterations throughout the existing detached single family dwelling.
Applied Sep 21, 2022 · issued Oct 6, 2022 · Permit 22 154106 HVA
- Inspections under way
Plumbing
Plumbing - Construct a new two storey rear addition, a new rear yard ground floor deck, interior alterations throughout the existing detached single family dwelling.
Applied May 31, 2022 · issued Jul 5, 2022 · Permit 22 154106 PLB
- Inspections under way
Small residential project · Multiple projects
Construct a new two storey rear addition, a new rear yard ground floor deck, interior alterations throughout the existing detached single family dwelling.
Applied May 31, 2022 · issued Jul 5, 2022 · Permit 22 154106 BLD
- Inspections under way
Drains and site services
Drain - Construct a new two storey rear addition, a new rear yard ground floor deck, interior alterations throughout the existing detached single family dwelling.
Applied May 31, 2022 · issued Jul 5, 2022 · Permit 22 154106 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey rear addition, a rear yard deck and a detached garage in the rear yard.
Decision: Approved (hearing Mar 10, 2022)
Filed Jan 12, 2022 · File A0061/22EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
26 Central St · Minor variance
To construct a new detached dwelling with an attached garage.
100 m away · filed Aug 24, 2026 · Hearing scheduled
40 Wheatfield Rd · Minor variance
To construct a second storey addition above the existing dwelling.
200 m away · filed May 14, 2026 · Approved
56 Lake Cres · Minor variance
To construct a one-storey rear addition, a rear yard deck and a concrete pad in the rear yard. The existing detached garage in the rear yard will be demolished.
130 m away · filed Aug 13, 2025 · Approved
14 Wheatfield Rd · Minor variance
To make interior alterations to accommodate a second secondary suite, to construct a second storey rear addition and a rear yard deck. A total of two secondary suites are proposed.
140 m away · filed Oct 26, 2022 · Approved
21 Dartmouth Cres · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Mar 16, 2022 · Approved
21 Dartmouth Cres · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed May 1, 2021 · Refused
3 Dartmouth Cres · Minor variance
To construct a detached rear yard garage with an attached studio, a rear yard deck, a covered front porch, and a proposed front yard parking space. A previous Committee of Adjustment application (A81/14EYK) approved new dwelling variances related to floor space index, setbacks, length, roof and wall height and platforms.
150 m away · filed Apr 27, 2021 · Approved
2588 Lake Shore Blvd W · Minor variance
To construct two-storey north and west side additions and to enlarge the existing garage. A previous committee of adjustment application (A0221/20EYK) approved variances related to the floor space index, side yard setback, and building length.
220 m away · filed Apr 18, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.