Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

5 Millbank Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Proposal to construct a new 3 storey SFD-detached dwelling. Demo existing SFD-Detached. See also 11 187449 ZZC, OMB decision and 11 263245 STE.

    Applied Apr 17, 2012 · issued May 25, 2012 · completed Aug 10, 2026 · 1 home added · Permit 12 155437 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1-19 Thelma Avenue

    7 storeys · 16 homes · Residential

    220 m away · Site plan · Under review · filed Jul 15, 2026

    Under review
  • 390-398 Spadina Road

    14 storeys · 54 homes · Mixed use

    290 m away · Rezoning · Approved · filed Dec 15, 2025

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 7 Relmar Gdns · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    170 m away · filed Jan 23, 2026 · Postponed

  • 478 Spadina Rd · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear deck on the second level. Also, to maintain the existing rear deck on the second level.

    230 m away · filed Oct 3, 2024 · Approved

  • 25 Delavan Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a balcony, and a two-storey partial west side addition (to accommodate a new interior stairwell).

    180 m away · filed Jun 1, 2024 · Approved

  • 20 Thelma Ave · Minor variance

    To construct a new three-storey detached dwelling with front integral garage, a front driveway, a rear basement walkout, a front second storey balcony, a front third storey balcony, and a roof deck. This dwelling will contain two units (one located in the basement and on the ground floor and one located on the ground floor and second and third storeys).

    230 m away · filed Jan 31, 2024 · Approved

  • 23 Strathearn Blvd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage (with access from Vesta Drive), a covered front (north) porch, a rear (south) ground floor partially covered terrace (outdoor room) with stairs, and a rear (south) basement walkout.

    110 m away · filed Jan 26, 2024 · Approved

  • 8 Relmar Rd · Minor variance

    To legalize and to maintain the excavated portion of the basement (below the existing covered front porch) and the accessible roof deck that was constructed without an authorized building permit on the three-storey semi-detached dwelling, beyond previous Minor Variance Decision A0058/17TEY.

    170 m away · filed Nov 3, 2023 · Approved

  • 8 Relmar Rd · Minor variance

    To legalize and to maintain the excavated portion of the basement (below the existing covered front porch) and the accessible roof deck that was constructed without an authorized building permit on the three-storey semi-detached dwelling, beyond previous Minor Variance Decision A0057/17TEY.

    170 m away · filed Nov 3, 2023 · Approved

  • 9 Relmar Rd · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch with canopy, a rear ground floor covered deck, a front basement walkout, front second and third storey balconies, and rear second and third storey balconies. Also, to construct a semi-detached garage with a front porch in the rear yard.

    160 m away · filed Jul 10, 2023 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.