Toronto address · Ward 14, Toronto-Danforth
50 Allen Ave
The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REV01: changes as per drawing
Applied Nov 18, 2020 · issued Nov 30, 2020 · Permit 20 144599 HVA (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for a third floor addition and interior alterations to all floors.
Applied May 12, 2020 · issued Jun 3, 2020 · Permit 20 144599 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for a third floor addition and interior alterations to all floors.
Applied May 12, 2020 · issued Jun 3, 2020 · Permit 20 144599 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for a third floor addition and interior alterations to all floors.
Applied May 12, 2020 · issued Jun 4, 2020 · Permit 20 144599 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2 ½-storey townhouse by constructing a rear third storey addition.
Decision: Approved (hearing Jan 15, 2020)
Filed Jul 2, 2019 · File A0713/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
410 m away · Site plan · Under review · filed Apr 24, 2024
- Approved
6 storeys · 15 homes · Mixed use
470 m away · Site plan · Approved · filed Apr 28, 2023
Neighbours’ Committee of Adjustment files within 250 m
195 De Grassi St · Minor variance
To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.
230 m away · filed May 20, 2026 · Approved
162 Boulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.
110 m away · filed Apr 17, 2026 · Approved
242 Boulton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).
240 m away · filed Sep 8, 2025 · Approved
310 Broadview Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a rear three-storey addition. There will be a total of one commercial unit (hair salon) and two residential dwelling units on this lot (one existing commercial unit occupying the first level, one existing dwelling unit occupying the second and third levels, as well as one new dwelling unit occupying the first, second and third levels).
220 m away · filed Jul 31, 2025 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling.
200 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
200 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
200 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
200 m away · filed Jan 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.