Toronto address · Ward 13, Toronto Centre
50 Gould St
Ryerson Community Park,Devonian Park
The City of Toronto has 100 building permits since 2017 (24 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Temporary structure · Temporary structures
Temporary structure / mobile stage for TMU Student Orientation as per site plan
Applied Aug 10, 2026 · issued Aug 28, 2026 · Permit 26 217020 TPS
- Closed
Designated structure · Sign building permit related
1 wall sign**toronto metropolitan university building ontario**
Applied Apr 10, 2026 · issued May 19, 2026 · completed Jun 22, 2026 · Permit 26 141577 DST
- Inspections under way
Temporary structure · Temporary structures
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.24-Aug.29 2025
Applied Aug 14, 2025 · issued Aug 21, 2025 · Permit 25 210121 TPS
- Revision issued
Heating and ventilation · HVAC: groups A & B
Revision to replacement of existing steam condensate tank.Installation of new relief vent for existing condensate receiver tank.
Applied Jul 16, 2025 · issued Jul 31, 2025 · Permit 21 180817 MSA (revision 01)
- Closed
Temporary structure · Other temporary tents
Proposal to install a 40 ft by 75 ft pre-engineered temporary tent on grassy grounds at Toronto Metropolitan University community park - Install February 04th and removal February 6th 2025
Applied Jan 28, 2025 · issued Feb 3, 2025 · completed Feb 11, 2025 · Permit 25 109546 TPS
- Inspections under way
Temporary structure · Other temporary tents
This project involves the installation of a 30 ft by 75 ft pre-engineered temporary tent on grassy grounds at Toronto Metropolitan University community park - Install October 27th and removal November 1st, 2024
Applied Oct 25, 2024 · issued Oct 25, 2024 · Permit 24 230960 TPS
- Inspections under way
Temporary structure · Temporary structures
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.25-Aug.30 2024
Applied Aug 19, 2024 · issued Sep 12, 2024 · Permit 24 200450 TPS
- Closed
Addition or alteration · Interior alterations
REVISION 01: Barrier-Free stair lift: change in fill railing panels from tempered glass to solid metal panelsInstallation of new barrier free ramp and lift in existing stair - Ryerson
Applied May 1, 2023 · issued May 19, 2023 · completed Sep 20, 2024 · Permit 21 129340 BLD (revision 01)
- Inspections under way
Heating and ventilation · Alter: add on /Ductwork
replace make up air unit and exhaust fans
Applied Sep 2, 2022 · issued Sep 9, 2022 · Permit 22 199197 MSA
- Closed
Addition or alteration · Interior alterations
The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting, updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load-bearing walls will be removed and rebuilt to match the new finish and look of the front reception area. SECURITY GRILLE NOT PART OF PERMIT DUE TO EGRESS CONCERNS.
Applied May 9, 2022 · issued Jun 8, 2022 · completed Sep 3, 2026 · Permit 22 144151 BLD
- Inspections under way
Plumbing
Plumbing - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load-bearing walls will be removedand rebuilt to match the new finish and look of the front reception area.
Applied May 9, 2022 · issued Jul 4, 2022 · Permit 22 144151 PLB
- Closed
Heating and ventilation
HVAC - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load-bearing walls will be removedand rebuilt to match the new finish and look of the front reception area.
Applied May 9, 2022 · issued Jul 4, 2022 · completed Sep 2, 2026 · Permit 22 144151 HVA
Show 88 more permits
- Closed
Addition or alteration · Interior alterations
Revision 01: Proposal to remove the tactile pad in the drawing A8
Applied Nov 3, 2021 · issued Nov 26, 2021 · completed Oct 28, 2022 · Permit 20 233216 BLD (revision 01)
- Inspections under way
Heating and ventilation · HVAC: groups A & B
Installation of new relief vent for existing condensate receiver tank.
Applied Jul 7, 2021 · issued Sep 7, 2021 · Permit 21 180817 MSA
- Closed
Addition or alteration · Interior alterations
Installation of new barrier free ramp and lift in existing stair - Ryerson
Applied Mar 19, 2021 · issued Aug 16, 2021 · completed Sep 20, 2024 · Permit 21 129340 BLD
- Closed
Addition or alteration · Interior alterations
REVISION 2 - alterations to the sprinkler system at Ryerson Kerr Hall South in the chiller roomProposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied Jan 21, 2021 · issued Feb 19, 2021 · completed Mar 1, 2022 · Permit 18 271784 BLD (revision 02)
- Permit issued
Heating and ventilation
HVAC - Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
Applied Jan 14, 2021 · issued Feb 4, 2021 · Permit 21 104543 HVA
- Permit issued
Addition or alteration · Other
Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
Applied Jan 14, 2021 · issued Feb 4, 2021 · Permit 21 104543 BLD
- Closed
Addition or alteration · Interior alterations
1. Restoration of the existing exterior entrance stairs 2. Waterproofing of the existing entrance structure 3. Interior entrance stairs restoration 4. Entrance structure skylight restoration4. Landscaping and lighting improvements at surrounding areas
Applied Dec 22, 2020 · issued Feb 23, 2021 · completed Oct 28, 2022 · Permit 20 233216 BLD
- Closed
Addition or alteration · Other
Proposal to reconstruct the west exit stairs in an existing university - Kerr Hall, Ryerson UniversityConvenience address is 379 Victoria St.
Applied Sep 18, 2020 · issued Nov 19, 2020 · completed Jan 26, 2022 · Permit 20 195473 BLD
- Closed
Addition or alteration · Interior alterations
Remove interior non load bearing partition walls to enlarge 2 classroom spaces. Interior renovation to include replacement of existing HVAC and AV systems. 2 New rooftop units being provided.
Applied Aug 14, 2020 · issued Nov 4, 2020 · completed Aug 31, 2021 · Permit 20 180517 BLD
- Closed
Heating and ventilation
HVAC - Remove interior non load bearing partition walls to enlarge 2 classroom spaces. Interior renovation to include replacement of existing HVAC and AV systems. 2 New rooftop units being provided.
Applied Aug 14, 2020 · issued Nov 4, 2020 · completed Sep 13, 2021 · Permit 20 180517 HVA
- Closed
Fire and security upgrade · Fire alarm
Revision 01 - Amend existing permit scope to include installation of new louvres and dampers for smoke venting in the KH Theatre.Proposal for a fire alarm system upgrade, installation of a new distributed fire alarm system, new initiating and signalling devices.
Applied Jun 15, 2020 · issued Jul 14, 2020 · completed Sep 25, 2024 · Permit 19 259828 FSU (revision 01)
- Closed
Addition or alteration · Other
REV01: REVISION TO BUILDING PERMIT #19 168814 BLD 00 BA and HVAC PERMIT #19 168814 HVA 00 MS. CHANGES INCLUDE ADDITION OF NEW WALK AROUND PLATFORM, ADDITIONAL STEEL FRAMING AND REVISIONS TO MECHANICAL DESIGNREMOVAL AND REPLACEMENT OF AN EXISTING ROOF TOP MAKE UP AIR UNIT TO BE INSTALLED IN A NEW LOCATION. SCOPE INCLUDES NEW ABOVE ROOF PLATFORM, LOCALIZED RE-ROOFING AND REVISIONS TO HVAC AND ELECTRICAL PROVISIONS
Applied Dec 18, 2019 · issued Feb 6, 2020 · completed Jun 25, 2020 · Permit 19 168814 BLD (revision 01)
- Closed
Heating and ventilation
REV01: REVISION TO BUILDING PERMIT #19 168814 BLD 00 BA and HVAC PERMIT #19 168814 HVA 00 MS. CHANGES INCLUDE ADDITION OF NEW WALK AROUND PLATFORM, ADDITIONAL STEEL FRAMING AND REVISIONS TO MECHANICAL DESIGNHVAC - REMOVAL AND REPLACEMENT OF AN EXISTING ROOF TOP MAKE UP AIR UNIT TO BE INSTALLED IN A NEW LOCATION. SCOPE INCLUDES NEW ABOVE ROOF PLATFORM, LOCALIZED RE-ROOFING AND REVISIONS TO HVAC AND ELECTRICAL PROVISIONS
Applied Dec 18, 2019 · issued Feb 4, 2020 · completed Feb 13, 2020 · Permit 19 168814 HVA (revision 01)
- Closed
Fire and security upgrade · Fire alarm
Proposal for a fire alarm system upgrade, installation of a new distributed fire alarm system, new initiating and signalling devices.
Applied Dec 11, 2019 · issued Mar 5, 2020 · completed Sep 25, 2024 · Permit 19 259828 FSU
- Permit issued
Addition or alteration · Other
Proposal to provide new 1.2 m x 1.2 m opening in existing concrete wall for new interior window installation.
Applied Dec 8, 2019 · issued Jan 9, 2020 · Permit 19 258560 BLD
- Closed
Heating and ventilation
HVAC - Proposed Interior Alterations to existing office space of existing Ryerson University building - Unit KHS346-348.
Applied Oct 11, 2019 · issued Nov 19, 2019 · completed Sep 4, 2020 · Permit 19 235695 HVA
- Closed
Addition or alteration · Interior alterations
Proposed Interior Alterations to existing office space of existing Ryerson University building - Unit KHS346-348.
Applied Oct 11, 2019 · issued Oct 22, 2019 · completed Apr 21, 2021 · Permit 19 235695 BLD
- Closed
Heating and ventilation
Hvac - removal and replacement of an existing roof top make up air unit to be installed in a new location. Scope includes new above roof platform, localized re-roofing and revisions to hvac and electrical provisions
Applied Jun 10, 2019 · issued Jul 12, 2019 · completed Feb 13, 2020 · Permit 19 168814 HVA
- Closed
Addition or alteration · Other
Removal and replacement of an existing roof top make up air unit to be installed in a new location. Scope includes new above roof platform, localized re-roofing and revisions to hvac and electrical provisions
Applied Jun 10, 2019 · issued Jun 27, 2019 · completed Jun 25, 2020 · Permit 19 168814 BLD
- Closed
Addition or alteration · Interior alterations
Revision 01 - add two roof top cooling tower cells to be connected to two new chillers - part of original permitProposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied May 14, 2019 · issued Jun 21, 2019 · completed Mar 1, 2022 · Permit 18 271784 BLD (revision 01)
- Closed
Heating and ventilation · Other
HVAC work associated with addition of booster pumps for lab equipment and humidifer at Kerr Hall North for Ryerson University
Applied May 14, 2019 · issued Jun 27, 2019 · completed Jun 16, 2020 · Permit 19 154286 MSA
- Closed
Heating and ventilation
Revision 01 - add two roof top cooling tower cells to be connected to two new chillers - part of original permitHVAC - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied May 14, 2019 · issued Jun 21, 2019 · completed Dec 24, 2020 · Permit 18 271784 HVA (revision 01)
- Cancelled
Heating and ventilation · Other
HVAC work associated with addition of booster pumps for lab equipment and humidifer at Kerr Hall North for Ryerson University
Applied Apr 11, 2019 · completed May 9, 2019 · Permit 19 139156 MSA
- Cancelled
Plumbing · Other
Addition of booster pumps for lab equipment; humidifer and condensate cooler at Kerr Hall North for Ryerson University
Applied Apr 11, 2019 · completed May 13, 2019 · Permit 19 139168 PSA
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St. "Please check sprinkler fee under BLD folder."
Applied Jan 24, 2019 · Permit 18 271784
- Inspections under way
Plumbing
Plumbing - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied Dec 24, 2018 · issued Feb 11, 2019 · Permit 18 271784 PLB
- Closed
Heating and ventilation
HVAC - Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied Dec 24, 2018 · issued Feb 8, 2019 · completed Dec 24, 2020 · Permit 18 271784 HVA
- Closed
Addition or alteration · Interior alterations
Proposed exteriror structural roof platform, removal of boiler and associated piping and installation of two(2) new chillers for the existing university building, convenience address is 40 Gould St.
Applied Dec 24, 2018 · issued Feb 8, 2019 · completed Mar 1, 2022 · Permit 18 271784 BLD
- Permit issued
Heating and ventilation · Other
Proposal to demolish and remove abandoned boilers and associated piping, accessories and electrical service in the existing university building, convenience address is 350 Victoria Street.
Applied Nov 14, 2018 · issued Dec 11, 2018 · Permit 18 256357 MSA
- Closed
Fire and security upgrade · Sprinklers
alter sprinkler system for Research Centre room 230/234 main floor
Applied Apr 5, 2018 · issued Jul 10, 2018 · completed Apr 1, 2019 · Permit 18 138900 FSU
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to provide a caged area within an existing storage room for chemical storage.
Applied Mar 2, 2018 · issued Mar 20, 2018 · completed Aug 26, 2026 · Permit 18 124101 BLD
- Refusal notice
Plumbing
Plumbing - Proposal for interior alterations to provide a caged area within an existing storage room for chemical storage.
Applied Mar 2, 2018 · Permit 18 124101 PLB
- Closed
Drains and site services · Site service
Proposed replacement of an existing private sanitary forcemain located on Ryerson University property.
Applied Jan 23, 2018 · issued Mar 5, 2018 · completed Sep 4, 2019 · Permit 18 108438 STS
- Closed
Heating and ventilation
REV 01 HVAC - Proposal for interior alterations to the first floor - room #'s NOS.KHS141, 143A, & 143B in existing university.
Applied Aug 22, 2017 · issued Sep 15, 2017 · completed May 17, 2018 · Permit 16 264909 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Rev01: Proposal for interior alterations to the first floor - room #'s NOS.KHS141, 143A, & 143B in existing university.
Applied Aug 22, 2017 · issued Sep 19, 2017 · completed Jul 18, 2018 · Permit 16 264909 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
Renovations to KHN-102 classroom including enlargement of existing doorway.
Applied Jul 27, 2017 · issued Aug 17, 2017 · completed Aug 21, 2018 · Permit 17 206640 BLD
- Closed
Heating and ventilation
HVAC - Renovations to KHN-102 classroom including enlargement of existing doorway.
Applied Jul 27, 2017 · issued Sep 1, 2017 · completed Jan 15, 2018 · Permit 17 206640 HVA
- Closed
Plumbing
Plumbing - Renovations to KHN-102 classroom including enlargement of existing doorway.
Applied Jul 27, 2017 · issued Sep 1, 2017 · completed Jul 27, 2018 · Permit 17 206640 PLB
- Closed
Addition or alteration · Interior alterations
Renovations to KHN-002 & KHN-004 Labs including enlargement of existing doorway.
Applied Jul 26, 2017 · issued Aug 15, 2017 · completed Oct 17, 2018 · Permit 17 205633 BLD
- Closed
Heating and ventilation
HVAC - Renovations to KHN-002 & KHN-004 Labs including enlargement of existing doorway.
Applied Jul 26, 2017 · issued Aug 29, 2017 · completed Sep 11, 2017 · Permit 17 205633 HVA
- Closed
Plumbing
Plumbing - Renovations to KHN-002 Lab including upgrades/ alteration to existing plumbing systems. specifically new sinks with back-flow preventers, new distilled water lines, and new eyewash station/ shower combos with floor drains.Renovations to KHN-002 & KHN-004 Labs including enlargement of existing doorway.
Applied Jul 26, 2017 · issued Aug 29, 2017 · completed May 4, 2018 · Permit 17 205633 PLB
- Closed
Addition or alteration · Interior alterations
Interior alterations to Kerr Hall East (2nd Floor - Rooms 231 and 231A) and Kerr Hall South (2nd Floor - Rooms 235 and 235 B) classrooms. Ryerson University.
Applied Apr 13, 2017 · issued Apr 26, 2017 · completed May 30, 2018 · Permit 17 144183 BLD
- Closed
Plumbing
Plumbing - Interior alterations to Kerr Hall East (2nd Floor - Rooms 231 and 231A) and Kerr Hall South (2nd Floor - Rooms 235 and 235 B) classrooms. Ryerson University.
Applied Apr 13, 2017 · issued May 15, 2017 · completed May 30, 2018 · Permit 17 144183 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations to Kerr Hall East (2nd Floor - Rooms 231 and 231A) and Kerr Hall South (2nd Floor - Rooms 235 and 235 B) classrooms. Ryerson University.
Applied Apr 13, 2017 · issued May 15, 2017 · completed May 19, 2018 · Permit 17 144183 HVA
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the 2nd and 3rd floors of existing university - Cemistry and Biology teaching and research labs - "Ryerson University".Convenience address is 43 Gerrard St E
Applied Mar 29, 2017 · issued May 19, 2017 · completed Nov 29, 2018 · Permit 17 136160 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the 2nd and 3rd floors of existing university - Cemistry and Biology teaching and research labs - "Ryerson University".Convenience address is 43 Gerrard St E
Applied Mar 29, 2017 · issued May 19, 2017 · completed Feb 15, 2019 · Permit 17 136160 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the 2nd and 3rd floors of existing university - Cemistry and Biology teaching and research labs - "Ryerson University".Convenience address is 43 Gerrard St E
Applied Mar 29, 2017 · issued May 19, 2017 · completed Mar 20, 2019 · Permit 17 136160 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the first floor - Kerr Hall East - computer lab renovations - in existing university - "Ryerson University"
Applied Mar 27, 2017 · issued May 2, 2017 · completed Jan 29, 2018 · Permit 17 134818 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the first floor - Kerr Hall East - computer lab renovations - in existing university - "Ryerson University". Convenience address is 60 Gould St.
Applied Mar 27, 2017 · issued May 2, 2017 · completed Feb 1, 2018 · Permit 17 134818 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the first floor - room #'s NOS.KHS141, 143A, & 143B in existing university.
Applied Dec 15, 2016 · issued Jan 17, 2017 · completed Jul 17, 2018 · Permit 16 264909 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the first floor - room #'s NOS.KHS141, 143A, & 143B in existing university.
Applied Dec 15, 2016 · issued Jan 17, 2017 · completed May 17, 2018 · Permit 16 264909 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the first floor - room #'s NOS.KHS141, 143A, & 143B in existing university.
Applied Dec 15, 2016 · issued Jan 13, 2017 · completed Jul 18, 2018 · Permit 16 264909 BLD
- Closed
Heating and ventilation
Revision # 01 - To the HVAC layout and unit in the existing university.HVAC - Interior alteration on the ground floor of the existing building
Applied Aug 10, 2016 · issued Sep 2, 2016 · completed Jan 6, 2017 · Permit 16 165049 HVA (revision 01)
- Closed
Plumbing
Revision # 01 To add a back flow prevention device in the existing university.Plumbing - Interior alteration on the ground floor of the existing building
Applied Aug 10, 2016 · issued Sep 2, 2016 · completed Jan 3, 2017 · Permit 16 165049 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposed interior renovation of rooms nos. Khw 269c (second floor) and khw 370 (third floor)
Applied Jul 5, 2016 · issued Jul 7, 2016 · completed Jan 4, 2017 · Permit 16 185367 BLD
- Closed
Plumbing
Plumbing - Interior alteration on the ground floor of the existing building
Applied May 31, 2016 · issued Jul 4, 2016 · completed Jan 3, 2017 · Permit 16 165049 PLB
- Closed
Addition or alteration · Interior alterations
Interior alteration on the ground floor of the existing building
Applied May 31, 2016 · issued Jun 6, 2016 · completed Jan 6, 2017 · Permit 16 165049 BLD
- Closed
Heating and ventilation
HVAC - Interior alteration on the ground floor of the existing building
Applied May 31, 2016 · issued Jun 22, 2016 · completed Jan 6, 2017 · Permit 16 165049 HVA
- Closed
Temporary structure · Other
Install one stage structure in Ryerson Community Park for Pride fundraising event beginning June 25, 2015.
Applied Jun 23, 2015 · issued Jun 26, 2015 · completed Feb 25, 2019 · Permit 15 178816 TPS
- Closed
Fire and security upgrade · Fire alarm
To install a fire control panel on the ground floor of the existing of Ryerson University Campus.
Applied Jul 23, 2014 · issued Aug 11, 2014 · completed Nov 2, 2017 · Permit 14 195527 FSU
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of 2 Backflow Prevention Devices (Water only)
Applied Jun 5, 2014 · issued Jun 16, 2014 · completed Jun 16, 2026 · Permit 14 169019 PSA
- Closed
Plumbing · Other
Permit to replace existing mechanical system and inlets to Ryerson Univeristy Pool in the athletic centre. RAC is underground.
Applied Feb 3, 2011 · issued Feb 11, 2011 · completed Jun 19, 2019 · Permit 11 119551 PSA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the Ryerson University, KHN-202, Chemistry Lab. This proposal includes HVAC and Plumbing.
Applied Apr 16, 2009 · issued May 29, 2009 · completed May 21, 2026 · Permit 09 127049 PLB
- Closed (dormant)
Heating and ventilation
HVAC - Replace ceiling tile in oublic corridor on First Floor of Kerr Hall Building ( recently completed asbestos abatement ) Ryerson
Applied Sep 16, 2008 · issued Oct 14, 2008 · completed Jun 8, 2026 · Permit 08 203141 HVA
- Closed
Addition or alteration · Interior alterations
Replace ceiling tile in public corridor on First Floor of Kerr Hall Building ( recently completed asbestos abatement ) Ryerson
Applied Sep 12, 2008 · issued Oct 14, 2008 · completed Aug 14, 2025 · Permit 08 203141 BLD
- Inspections under way
Addition or alteration · Interior alterations
Make interior alterations to second floor of Kerr Hall (Ryerson).
Applied Dec 6, 2007 · issued Dec 14, 2007 · Permit 07 284964 BLD
- Inspections under way
Heating and ventilation
HVAC - Make interior alterations to second floor of Kerr Hall (Ryerson).
Applied Dec 6, 2007 · issued Dec 14, 2007 · Permit 07 284964 HVA
- Closed (dormant)
Heating and ventilation
HVAC - Make interior alterations to classrooms & office space.
Applied May 30, 2007 · issued Jun 15, 2007 · completed Jun 8, 2026 · Permit 07 225116 HVA
- Closed
Addition or alteration · Interior alterations
Make interior alterations to classrooms & office space.
Applied May 30, 2007 · issued Jun 12, 2007 · completed Aug 20, 2025 · Permit 07 225116 BLD
- Permit issued
Heating and ventilation · Other
Stand alone mechanical work for existing university chemistry lab - KHN 106 - Ac unit and roof top unit - exhaust system.
Applied Apr 30, 2007 · issued May 9, 2007 · Permit 07 180988 MSA
- Inspections under way
Addition or alteration · Interior alterations
Interior Alterations to existing Fitness Centre - Ryerson University (RAC) - Barrier Free Alterations.
Applied Mar 14, 2007 · issued Mar 20, 2007 · Permit 07 115600 BLD
- Closed (dormant)
Heating and ventilation
HVAC - Interior Alterations to existing Fitness Centre - Ryerson University (RAC) - Barrier Free Alterations.
Applied Mar 14, 2007 · issued Mar 20, 2007 · completed Jun 8, 2026 · Permit 07 115600 HVA
- Inspections under way
Plumbing
Plumbing - Interior Alterations to existing Fitness Centre - Ryerson University (RAC) - Barrier Free Alterations.
Applied Mar 14, 2007 · issued Mar 20, 2007 · Permit 07 115600 PLB
- Inspections under way
Heating and ventilation
HVAC - Installation of new Emergency Generator and Interior alterations to existing Mech. Penthouse.See 02-109590 BLD for initial Emergency Generator Install.
Applied Dec 7, 2006 · issued Dec 7, 2006 · Permit 05 211976 HVA
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to part of 3rd floor, Unit KHN 302 - Interior Alterations
Applied Mar 28, 2006 · issued Mar 31, 2006 · Permit 06 113913 HVA
- Inspections under way
Heating and ventilation
HVAC - renovation of an existing lab to accommodate a duct shaft - Interior Alterations
Applied Jan 12, 2006 · issued Jan 30, 2006 · Permit 05 201223 HVA
- Closed
Addition or alteration · Interior alterations
Installation of new Emergency Generator and Interior alterations to existing Mech. Penthouse.See 02-109590 BLD for initial Emergency Generator Install.
Applied Dec 23, 2005 · issued Jan 3, 2006 · completed Aug 13, 2025 · Permit 05 211976 BLD
- Closed
Addition or alteration · Interior alterations
renovation of an existing lab to accommodate a duct shaft
Applied Nov 9, 2005 · issued Nov 17, 2005 · completed Aug 14, 2025 · Permit 05 201223 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to convert classroom E217 to undergrad chem labs, change classroom E 313 and E 315 TO biology labs, change classroom E 322 to biology and chem research labs. - Interior Alterations
Applied Jul 25, 2005 · issued Jul 25, 2005 · Permit 05 122634 PLB
- Closed
Addition or alteration · Interior alterations
Interior alterations to convert classroom E217 to undergrad chem labs, change classroom E 313 and E 315 TO biology labs, change classroom E 322 to biology and chem research labs.
Applied Apr 12, 2005 · issued Apr 19, 2005 · completed Aug 12, 2025 · Permit 05 122634 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to convert classroom E217 to undergrad chem labs, change classroom E 313 and E 315 TO biology labs, change classroom E 322 to biology and chem research labs. - Interior Alterations
Applied Apr 12, 2005 · issued Apr 22, 2005 · Permit 05 122634 HVA
- Closed (dormant)
Heating and ventilation
HVAC - Make interior alterations to the ground, 2nd and 3rd floor. Existing and proposed: University - Interior Alterations
Applied Dec 22, 2004 · issued Jan 24, 2005 · completed Jun 8, 2026 · Permit 04 201649 HVA
- Closed
Addition or alteration · Interior alterations
Make interior alterations to the ground, 2nd and 3rd floor. Existing and proposed: University
Applied Dec 20, 2004 · issued Jan 24, 2005 · completed Sep 3, 2025 · Permit 04 201649 BLD
- Closed
Fire and security upgrade · Sprinklers
Provide shop drawings for sprinkler system in conjunction with application under file 03 - 104642
Applied Feb 12, 2003 · issued Feb 19, 2003 · completed Feb 7, 2024 · Permit 03 107929 FSU
- Closed (dormant)
Heating and ventilation · Special ventilation system
Install kitchen exhaust system on 2nd floor (analytical Research Lab. F2 - (Rm. N213A)Kerr Hall see 01 - 166647
Applied Apr 16, 2002 · issued May 2, 2002 · completed Jun 8, 2026 · Permit 02 126860 MSA
- Closed (dormant)
Heating and ventilation · Install/Alter HVAC - only
Alter existing h.v.a.c. system on portions of the second and third floor. (room e211 and e319b). (convenience address: 340 Church St. Kerr Hall)
Applied Nov 16, 1999 · issued Nov 30, 1999 · completed Jun 8, 2026 · Permit 99 110197 HVA
- Closed (dormant)
Heating and ventilation · Unknown
H.v.a.c alter ductwork on portion of 3rd floor biotechnolgy research lab and portion of 1st floor chemical engineering research lab. See 419150 cost included
Applied Nov 4, 1998 · issued Dec 3, 1998 · completed Jun 8, 2026 · Permit 98 023548 HVA
- Closed
Addition or alteration · Unknown
Make interior alterations to portion of 1st floor (north-east corner). Chemical lab listed: historical edc
Applied May 3, 1995 · issued May 24, 1995 · completed Aug 18, 2025 · Permit 95 015884 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
73-77 McGill Street, 396-398 Church Street and 50 Gerrard Street East
43 storeys · 463 homes · Mixed use
170 m away · Site plan · Under review · filed Nov 8, 2022
- Under review
20 Gerrard Street East and 21 McGill Street
7 storeys · Residential
200 m away · Site plan · Under review · filed May 25, 2026
- Under review
- Under review
76 storeys · 828 homes · Mixed use
230 m away · Site plan · Under review · filed Jun 14, 2022
- Under review
9-17 McGill Street and 409-415 Yonge Street
Not stated in the file
240 m away · Subdivision · Under review · filed Nov 5, 2021
- Under review
412-418 Church Street and 79-81 Granby Street
33 storeys · Mixed use
240 m away · Site plan · Under review · filed Feb 5, 2023
Neighbours’ Committee of Adjustment files within 250 m
50 Gerrard St E · Consent
To obtain consent to sever a portion of stratified land (air-rights above an elevation of 121 m) for the purpose of a lot addition.
120 m away · filed May 15, 2026 · Postponed
145 Mutual St · Minor variance
To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.
240 m away · filed Aug 28, 2024 · Approved
50 Gerrard St E · Minor variance
To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.
120 m away · filed Nov 14, 2023 · Approved
340 Yonge St · Minor variance
To permit an amusement arcade use (claw machines) on the ground level of the existing three-storey commercial building.
230 m away · filed Sep 8, 2023 · Approved
137 Bond St · Minor variance
To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.
120 m away · filed Apr 6, 2023 · Approved
363 Yonge St · Minor variance
To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).
190 m away · filed Dec 30, 2022 · Approved
64 McGill St · Minor variance
To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.
210 m away · filed Oct 6, 2021 · Approved
348 Yonge St · Consent
To obtain consent to create an easement/right-of-way for vehicular and pedestrian access for emergency purposes only.
230 m away · filed Jul 9, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.