Toronto address · Ward 11, University-Rosedale
50 St Joseph St
St Basil's Church
The City of Toronto has 18 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Addition or alteration · Interior alterations
Proposal to divide one large office into two individual offices.
Applied Sep 15, 2026 · Permit 26 237987 BLD
- Closed
Plumbing · Fixtures/Roof Drains: other
Addition of indirect domestic hot water heater to make Odette Hall and St. Basil's Church domestic hot water system independent of the domestic hot water plant located in the boiler plant building elsewhere on campus.
Applied Feb 2, 2017 · issued Feb 23, 2017 · completed Jun 27, 2017 · Permit 17 112463 PSA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the basement level of existing place of worship. "St Basil"
Applied Jun 16, 2016 · issued Nov 7, 2016 · completed Nov 29, 2018 · Permit 16 175187 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the basement level of existing place of worship. "St Basil"
Applied Jun 16, 2016 · issued Nov 7, 2016 · completed Jun 8, 2017 · Permit 16 175187 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the basement level of existing place of worship. "St Basil"
Applied Jun 16, 2016 · issued Nov 7, 2016 · completed Jan 8, 2019 · Permit 16 175187 HVA
- Inspections under way
Addition or alteration · Other
Proposed outdoor concrete slab on grade and the related pipe support framework and footings related to the installation of new air cooled chiller and piping under permit 16 132968 MSA 00 MS.
Applied Apr 13, 2016 · issued Sep 19, 2016 · Permit 16 132968 BLD
- Inspections under way
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposal to add new air cooled chiller and ties into existing fan coil system to provide cooling in existing place of worship. See 16 132968 BLD 00 MS for related structural work.
Applied Mar 29, 2016 · issued Sep 23, 2016 · Permit 16 132968 MSA
- Closed
New building
Revision # 03 - To remove door and wall from ground floor to basement in 13 townhomes.Revision to add 1 additional floor on each condo tower with a total of 17 new dwelling units (9 in west and 8 in the east tower). See COA and OMB.
Applied Oct 1, 2015 · issued Oct 20, 2015 · completed Oct 30, 2018 · Permit 10 136882 BLD (revision 03)
- Closed
New building
Revision # 02 - To relocate the siamese connection on the east and west towers.Revision to add 1 additional floor on each condo tower with a total of 17 new dwelling units (9 in west and 8 in the east tower). See COA and OMB.
Applied Mar 5, 2015 · issued Jun 4, 2015 · completed Oct 30, 2018 · Permit 10 136882 BLD (revision 02)
- Closed
Plumbing
Revision to add 1 additional floor on each condo tower with a total of 18 new dwelling units (9 in each tower). See COA and OMB.
Applied Aug 15, 2014 · issued Aug 29, 2014 · completed Oct 30, 2018 · Permit 10 136882 PLB (revision 01)
- Closed
Heating and ventilation
Revision to add 1 additional floor on each condo tower with a total of 18 new dwelling units (9 in each tower). See COA and OMB.
Applied Aug 15, 2014 · issued Aug 29, 2014 · completed Oct 30, 2018 · Permit 10 136882 HVA (revision 01)
- Closed
New building
Revision to add 1 additional floor on each condo tower with a total of 17 new dwelling units (9 in west and 8 in the east tower). See COA and OMB.
Applied Aug 15, 2014 · issued Nov 6, 2014 · completed Oct 30, 2018 · 17 homes added · Permit 10 136882 BLD (revision 01)
Show 6 more permits
- Closed
Fire and security upgrade · Sprinklers
Permit for new sprinkler system in new condo. See 10 136882 BLD for building permit - Please note fees paid under building permit.
Applied Sep 18, 2012 · issued Sep 26, 2012 · completed Oct 30, 2018 · Permit 12 248651 FSU
- Closed
Plumbing
Plumbing - FOR PLANS SEE HVAC FILE -Proposal to construct 2 condo towers (45 sty and 55 sty) on a 3 sty townhouse podium, 5 levels of below grade parking, and 985 residential units. See folder for Heritage approval for a adjacent building, Final & Binding, and Site Plan approval. Also see folder for list of new addresses.
Applied Mar 31, 2010 · issued Apr 20, 2011 · completed Oct 30, 2018 · Permit 10 136882 PLB
- Closed
Drains and site services
Drain - FOR PLANS SEE HVAC FILE -Proposal to construct 2 condo towers (45 sty and 55 sty) on a 3 sty townhouse podium, 5 levels of below grade parking, and 985 residential units. See folder for Heritage approval for a adjacent building, Final & Binding, and Site Plan approval. Also see folder for list of new addresses.
Applied Mar 31, 2010 · issued Apr 20, 2011 · completed Oct 31, 2018 · Permit 10 136882 DRN
- Closed
Heating and ventilation
HVAC - Proposal to construct 2 condo towers (45 sty and 55 sty) on a 3 sty townhouse podium, 5 levels of below grade parking, and 985 residential units. See folder for Heritage approval for a adjacent building, Final & Binding, and Site Plan approval. Also see folder for list of new addresses.
Applied Mar 31, 2010 · issued Apr 20, 2011 · completed Oct 30, 2018 · Permit 10 136882 HVA
- Closed
New building
Proposal to construct 2 condo towers (45 sty and 55 sty) on a 3 sty townhouse podium, 5 levels of below grade parking, and 985 residential units. See folder for Heritage approval for a adjacent building, Final & Binding, and Site Plan approval. Also see folder for list of new addresses.
Applied Mar 23, 2010 · issued Dec 17, 2010 · completed Oct 30, 2018 · 985 homes added · Permit 10 136882 BLD
- Closed (dormant)
Addition or alteration · Unknown
Make interior alterations to portion of the basement, 1st, 2nd, and 3rd floors (east portion - clover hill wing). "designated historical" /lm
Applied Feb 10, 1995 · issued May 15, 1995 · completed Jun 8, 2026 · Permit 95 013094 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
59 storeys · 540 homes · Mixed use
100 m away · Condominium · Under review · filed Oct 22, 2021
- Under review
- Approved
40 storeys · 446 homes · Residential
160 m away · Site plan · Approved · filed Apr 19, 2022
- Under review
646-664 Yonge Street and 2-4 Irwin Avenue
75 storeys · 548 homes · Mixed use
250 m away · Site plan · Under review · filed Dec 22, 2022
- Under review
59 storeys · 650 homes · Mixed use
270 m away · Site plan · Under review · filed Jul 23, 2021
Neighbours’ Committee of Adjustment files within 250 m
25 St Mary St · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 596-2023, for the existing 24-storey mixed-use building to modify the building setbacks and to reduce the indoor amenity provisions. This is currently under the review of Site Plan Control (File No. 21 166615 STE 13 SA). There will be a total of 1,024 residential dwelling units on this lot with retail and a daycare facility on the ground floor.
170 m away · filed Jan 20, 2026 · Application withdrawn
2 St Thomas St · Consent
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
240 m away · filed Dec 31, 2025 · Hearing scheduled
70 St Mary St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.
140 m away · filed Dec 9, 2024 · Approved
95 St Joseph St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-ways within a 40-storey mixed-use redevelopment.
130 m away · filed Jun 18, 2024 · Approved
95 St Joseph St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).
130 m away · filed Jun 18, 2024 · Approved
1099 Bay St · Minor variance
To alter the existing 27-storey mixed-use building by constructing a storage area on Level P4 (to replace an existing non-conforming storage area on Level P5), and to permit a reduction in the number of parking spaces for residents from 127 spaces to 112 spaces. The 15 existing parking spaces for visitors will be maintained and unaltered. Also, to permit a reduction to the required length of 25 existing parking spaces.
150 m away · filed Jan 24, 2024 · Withdrawn
63 St Nicholas St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.
230 m away · filed Sep 14, 2022 · Approved
57 Charles St W · Minor variance
To alter the existing 20-storey residential apartment building, containing 397 residential units, by: converting the second floor office and sauna spaces into two dwelling units, for a total of 399 residential units in the building, and providing seven additional bicycle parking spaces on the basement A level.
160 m away · filed Aug 13, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.