Toronto address · Ward 19, Beaches-East York
53 Dawes Rd
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Fire alarm
The existing ¿EST1-2Z3¿ Fire Alarm Control Panel to be replaced with a new ¿Mircom FA-106¿ Fire Alarm Control Panel installed in the same location ¿ at the main entrance.The zone schedule to remain as is. All of the original signal and initiating wiring to remain with no alterations.All existing devices (manual pull stations, heat detectors, flow switches and bells) shall remain with no alterations.
Applied Feb 6, 2024 · issued Feb 23, 2024 · Permit 24 112289 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 64 homes · Not stated in the file
170 m away · Site plan · Under review · filed Mar 10, 2026
- Under appeal
55 storeys · 1,139 homes · Mixed use
210 m away · Subdivision · Under appeal · filed Nov 7, 2021
- Approved
38 storeys · 636 homes · Mixed use
210 m away · Site plan · Approved · filed Aug 10, 2021
- Under review
33 storeys · 769 homes · Mixed use
250 m away · Condominium · Under review · filed Oct 28, 2021
- Under appeal
48 storeys · 1,050 homes · Residential
280 m away · Rezoning · Under appeal · filed Dec 21, 2022
- Under review
Neighbours’ Committee of Adjustment files within 250 m
9 Avonlea Blvd · Minor variance
240 m away · filed Aug 17, 2026 · Postponed
26 Luttrell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition.
240 m away · filed Jun 30, 2026 · Postponed
9 Avonlea Blvd · Minor variance
To construct a one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway (Sibley Avenue). The existing one-storey shed will be demolished.
240 m away · filed Oct 22, 2025 · Approved
10 Dawes Rd · Minor variance
To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.
250 m away · filed May 3, 2024 · Approved
102 Dawes Rd · Minor variance
To construct a new two-storey ancillary building (one garden suite with a side north integral garage), in the rear yard, abutting Dentonia Park Avenue. The existing ancillary building (detached garage) will be demolished.
210 m away · filed Jan 24, 2024 · Approved
102 Dawes Rd · Consent
To obtain consent to sever the lot into two residential lots, of which one lot will be undersized, and to retain an existing easement/right-of-way.
210 m away · filed Jan 24, 2024 · Approved
102 Dawes Rd · Minor variance
To construct a new three-storey detached dwelling with a front covered porch, a rear basement walkout, a rear ground floor deck, and a rear third storey balcony.
210 m away · filed Jan 24, 2024 · Approved
9 Dawes Rd · Minor variance
To alter the development standards for a mixed-use building approved under Site Specific Zoning By-law 235-2023(OLT) by increasing the building height (6.5 m to 7.8 m, 83.7 m to 100.3 m, 87.3 m to 104.3 m, 91 m to 92.6 m, 94.3 m to 110.8 m, and 84.5 m to 86.1 m) as well as the total gross floor area, and to reduce a building setback.
250 m away · filed Nov 7, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.