The City of Toronto has 9 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    REVISION 3 - new doorway to connect with 54 St Patrick with 54 1/2 St Patrick - both office use.Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor]

    Applied Nov 30, 2018 · issued Jan 30, 2019 · Permit 14 265310 BLD (revision 03)

    Revision issued
  • Heating and ventilation

    Rev 01 - related to 14-265310 BLD 02 BA, which reduces the scope of work: there are no additions to the structure either at the back or on the third storey. The current application also has minor revisions to the design: washroom moved from the back of the building to front, orientation of basement staircase is revised from a U to an L shape, there is now a concrete deck at the front as opposed to wood, there are windows in the north wall, and occupancy is reduced to 15 people. HVAC, plumbing, and electrical have been revised per the lesser scope of work in this project. HVAC - Proposal to co…

    Applied Nov 27, 2017 · issued Jan 10, 2018 · completed Dec 14, 2018 · Permit 14 265310 HVA (revision 01)

    Closed
  • Plumbing

    Rev 01 - related to 14-265310 BLD 02 BA, which reduces the scope of work: there are no additions to the structure either at the back or on the third storey. The current application also has minor revisions to the design: washroom moved from the back of the building to front, orientation of basement staircase is revised from a U to an L shape, there is now a concrete deck at the front as opposed to wood, there are windows in the north wall, and occupancy is reduced to 15 people. HVAC, plumbing, and electrical have been revised per the lesser scope of work in this project. Plumbing - Proposal t…

    Applied Nov 27, 2017 · issued Jan 10, 2018 · completed Jan 4, 2019 · Permit 14 265310 PLB (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Revision 02 - The current application significantly reduces the scope of work from original permit: there are no additions to the structure either at the back or on the third storey. The current application also has minor revisions to the design: washroom moved from the back of the building to front, orientation of basement staircase is revised from a U to an L shape, there is now a concrete deck at the front as opposed to wood, there are windows in the north wall, and occupancy is reduced to 15 people. See bubbled drawings for revisions.Rev 1 - Proposed revision to basement to include baseme…

    Applied Nov 3, 2017 · issued May 16, 2018 · Permit 14 265310 BLD (revision 02)

    Revision issued
  • Addition or alteration · Multiple projects

    Rev 1 - Proposed revision to basement to include basement underpinning.[Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor]

    Applied Feb 6, 2017 · issued Jun 9, 2017 · Permit 14 265310 BLD (revision 01)

    Revision issued
  • Drains and site services · Inside and outside drains

    Drain - Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor

    Applied Dec 17, 2014 · issued Jan 15, 2018 · completed Jan 4, 2019 · Permit 14 265310 STS

    Closed
  • Heating and ventilation

    HVAC - Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor

    Applied Dec 17, 2014 · issued Apr 27, 2015 · completed Dec 14, 2018 · Permit 14 265310 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor

    Applied Dec 17, 2014 · issued Apr 27, 2015 · completed Jan 4, 2019 · Permit 14 265310 PLB

    Closed
  • Addition or alteration · Multiple projects

    Proposal to convert the existing single family detached dwelling to an office building, a partial third storey addition will be constructed on top of the existing two storey portion of the building, a new three storey addition at the rear with decks on the first and second floor

    Applied Dec 17, 2014 · issued Aug 31, 2016 · 1 home removed · Permit 14 265310 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 234 Simcoe St · Consent

    Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    160 m away · filed Mar 13, 2026 · Approved

  • 220 Simcoe St · Consent

    To obtain consent for the purpose of a lot addition.

    100 m away · filed Feb 28, 2018 · Approved

  • 241 Queen St W · Minor variance

    To alter the existing 4-storey commercial building by converting the basement storage area into an Eating Establishment (iYellow Wine Club Tasting Bar and classes).

    210 m away · filed Jul 28, 2017 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.