Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

57 St Nicholas St

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Back Water Valve installation

    Applied Feb 11, 2025 · issued Feb 11, 2025 · completed Feb 13, 2025 · Permit 25 115691 DRN

    Closed
  • Heating and ventilation

    HVAC - Construct 2 storey rear addition and interior alterations

    Applied Sep 7, 2019 · issued Sep 13, 2019 · completed Aug 11, 2020 · Permit 19 154319 HVA

    Closed
  • Plumbing

    Plumbing - Construct 2 storey rear addition and interior alterations

    Applied May 14, 2019 · issued May 28, 2019 · completed Aug 11, 2020 · Permit 19 154319 PLB

    Closed
  • Small residential project · Multiple projects

    Construct 2 storey rear addition and interior alterations

    Applied May 14, 2019 · issued May 28, 2019 · completed Aug 11, 2020 · Permit 19 154319 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey townhouse by constructing a two-storey rear addition.

    Decision: Approved (hearing Jun 27, 2018)

    Filed Jan 29, 2018 · File A0103/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 25 St Mary St · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 596-2023, for the existing 24-storey mixed-use building to modify the building setbacks and to reduce the indoor amenity provisions. This is currently under the review of Site Plan Control (File No. 21 166615 STE 13 SA). There will be a total of 1,024 residential dwelling units on this lot with retail and a daycare facility on the ground floor.

    80 m away · filed Jan 20, 2026 · Application withdrawn

  • 7 Charles St W · Consent

    To obtain consent for a technical severance to re-establish the lots which merged on title.

    150 m away · filed Nov 5, 2024 · Approved

  • 577 Yonge St · Minor variance

    To permit the following uses within the existing four-storey non-residential building: a nightclub use within the basement, eating establishment use on the ground level, retail store use on the second level, place of assembly use on the third level, and recreation use on the fourth level.

    220 m away · filed Aug 23, 2024 · Approved

  • 680 Yonge St · Minor variance

    To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.

    30 m away · filed Aug 23, 2024 · Approved

  • 593 Yonge St · Minor variance

    To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.

    150 m away · filed Jul 23, 2024 · Approved

  • 7 Gloucester St · Consent

    To obtain consent to sever the property into two residential lots. The existing easements/rights-of-way will be maintained and unaltered. The existing 44-storey mixed-use building (also on the lot) will be maintained and unaltered. This building is under a condo ownership and requires a variance to the Zoning By-law as outlined in Minor Variance Application A0653/24TEY.

    150 m away · filed Jul 23, 2024 · Approved

  • 11 Gloucester St · Minor variance

    To convert the existing two-and-one-half-storey townhouse into a mixed-use building.

    160 m away · filed Jul 23, 2024 · Approved

  • 30 Charles St E · Minor variance

    To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.

    250 m away · filed Jun 2, 2024 · Refused

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.