Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

58 Taunton Rd

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Interior alterations to all floors and rear deck. SFD

    Applied Aug 2, 2013 · issued Aug 6, 2013 · Permit 13 182515 DRN

    Permit issued
  • Small residential project · Multiple projects

    Revision to underpin basement. See party wall admin permit for 60 Taunton Rd.

    Applied Aug 2, 2013 · issued Aug 6, 2013 · Permit 13 182515 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Interior alterations to all floors and rear deck. SFD

    Applied Jun 6, 2013 · issued Jun 6, 2013 · Permit 13 182515 PLB

    Permit issued
  • Small residential project · Multiple projects

    Interior alterations to all floors and rear deck. SFD

    Applied Jun 6, 2013 · issued Jun 6, 2013 · Permit 13 182515 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 37 Falcon St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third-storey addition and a new rear one-storey addition.

    150 m away · filed Jul 7, 2025 · Approved

  • 27 Taunton Rd · Minor variance

    To construct a new two storey semi-detached dwelling with front a porch and a rear deck.

    90 m away · filed May 21, 2025 · Approved

  • 18 Brownlow Ave · Minor variance

    To alter the development standards for the 21-storey residential building (approved under Site Specific Zoning By-Law 382-2023(OLT)), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor area and permitted projections, revising minimum setbacks and main wall separation distances, and reducing required indoor amenity space and required parking spaces.

    250 m away · filed Feb 14, 2025 · Approved

  • 55 Brownlow Ave · Consent

    To obtain consent to sever the lot into two residential lots and to create new easements/rights-of-way.

    180 m away · filed Jan 20, 2025 · Approved

  • 18 Brownlow Ave · Consent

    To obtain consent to sever portions of the land (below-grade strata) for the purpose of a lot addition and to create new easements/rights-of-way.

    250 m away · filed Apr 19, 2024 · Approved

  • 18 Brownlow Ave · Consent

    To obtain consent to sever portions of the land (above and below-grade strata) for the purpose of lot additions and to create new easements/rights-of-way.

    250 m away · filed Mar 15, 2024 · Approved

  • 18 Brownlow Ave · Minor variance

    To alter development standards for the 21-storey residential building as indicated in City of Toronto By-law 382-2023(OLT), to permit an increased footprint and height of the mechanical penthouse with a reduced setback to the north property line for the mechanical penthouse.

    250 m away · filed Dec 11, 2023 · Approved

  • 717 Mount Pleasant Rd · Minor variance

    To permit the addition of 4 storeys above the approved 23 storey building, as well as squaring off the curvature nature of the west façade by reducing the north, south and west tower setbacks. Please note this application was previously deferred Thursday, July 27, 2023.

    100 m away · filed Apr 18, 2023 · Refused

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.