Toronto address · Ward 13, Toronto Centre
60 Wascana Ave
The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Garage
Proposed new detached garage
Applied Feb 18, 2026 · completed Feb 23, 2026 · Permit 26 118223 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Hearing scheduled
Minor variance · Other
To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.
Hearing Oct 14, 2026
Filed Jul 22, 2026 · File A0544/26TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
15 storeys · Residential
260 m away · Rezoning · Under appeal · filed May 27, 2021
- Under review
15 storeys · 151 homes · Residential
290 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
430 homes · Residential
290 m away · Condominium · Under review · filed Nov 4, 2021
- Under review
747-761 Dundas Street East and 2 Mark Street
48 storeys · 1,197 homes · Mixed use
320 m away · Rezoning · Under review · filed Oct 8, 2025
- Under review
9 storeys · 85 homes · Residential
340 m away · Site plan · Under review · filed Sep 15, 2022
- Under review
43 storeys · 997 homes · Residential
430 m away · Site plan · Under review · filed Mar 23, 2023
Neighbours’ Committee of Adjustment files within 250 m
498 Queen St E · Minor variance
To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.
250 m away · filed Mar 7, 2025 · Deferred
83 River St · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.
190 m away · filed May 1, 2024 · Approved
41 River St · Minor variance
To alter the existing five-storey mixed-use building containing 26 residential dwelling units and 3 artist studios (on the ground level), by constructing an additional residential dwelling unit within the mechanical penthouse, for a total of 27 residential dwelling units.
50 m away · filed Feb 13, 2024 · Approved
1 Ashby Pl · Minor variance
To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.
250 m away · filed Aug 30, 2023 · Approved
97 Sumach St · Minor variance
To convert the existing three-storey townhouse from one unit into two units by installing a secondary suite within the basement and by constructing: a two storey rear addition; a partial third storey addition with a rear third storey roof terrace; a new front porch with stairs and a canopy; and a new rear basement walkout. Also, to construct an ancillary building (detached shed) in the rear yard of the property, abutting the laneway.
200 m away · filed Feb 28, 2022 · Approved
25 Nicholas Ave · Minor variance
To alter the development proposal for a 28-storey mixed-use building including a four to six-storey podium and 24 three-storey back-to-back townhouses by permitting 11 undersized parking spaces.
180 m away · filed Mar 17, 2021 · Approved
29 Wascana Ave · Minor variance
To construct a new front entrance.
110 m away · filed Feb 4, 2021 · Approved
39 River St · Minor variance
To demolish the existing two-storey detached dwelling and construct a four-storey apartment building (stacked townhouse development) with a total of 10 residential units and rooftop terraces.
50 m away · filed Jun 5, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.