Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

61 Salem Ave

The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed second floor addition, reconstruction of front porch, new rear deck and interior alterations to an existing single famiily semi-detached dwelling,

    Applied Oct 7, 2021 · issued Oct 7, 2021 · completed Apr 25, 2023 · Permit 21 124489 DRN

    Closed
  • Small residential project · Multiple projects

    Proposed second floor addition, reconstruction of front porch, new rear deck and interior alterations to an existing single famiily semi-detached dwelling,

    Applied Mar 8, 2021 · issued Apr 27, 2021 · Permit 21 124489 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to an existing single famiily semi-detached dwelling,

    Applied Mar 8, 2021 · issued Apr 27, 2021 · completed Apr 12, 2023 · Permit 21 124489 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to an existing single famiily semi-detached dwelling,

    Applied Mar 8, 2021 · issued Apr 27, 2021 · completed Jul 7, 2026 · Permit 21 124489 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 800 Dovercourt Rd · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.

    160 m away · filed Jul 13, 2026 · Hearing scheduled

  • 91 Salem Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new front one-storey addition with stairs, a front basement walkout, and a rear one-storey addition with a wood landing. The existing rear ground floor deck will be maintained and unaltered.

    90 m away · filed Oct 23, 2025 · Approved

  • 57 Bartlett Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (cantilevered at the rear portion).

    110 m away · filed Mar 19, 2025 · Approved

  • 79 Bartlett Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear walkway. Also, to alter the existing one-storey ancillary building (rear detached garage, abutting the laneway) by constructing a complete second storey addition for one laneway suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).

    140 m away · filed Oct 24, 2024 · Approved

  • 99 Bartlett Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front stairs, and enclosing the front porch.

    180 m away · filed Feb 13, 2024 · Approved

  • 980 Bloor St W · Minor variance

    To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 604-2022 ), by increasing the overall building height, density, and number of storeys from 11 to 13 storeys. Also, to reduce the development standards for required amenity space from 468 m2 to 453 m2, to reduce the required number of resident parking spaces from 52 to 42, and to alter the required dimensions of bicycle parking spaces.

    230 m away · filed Jan 15, 2024 · Approved

  • 129 Shanly St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a rear second storey addition, a rear ground floor deck (to replace the existing rear ground floor deck), a front second floor box bay window (to replace the existing bay window) with a front third storey balcony above, and second and third floor rear balconies.

    230 m away · filed Nov 22, 2023 · Approved

  • 10 Bartlett Ave · Minor variance

    To construct a two-storey ancillary building (garage with storage above) in the rear yard of the property, abutting Boilermaker Lane.

    180 m away · filed Mar 10, 2023 · Deferred

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.