Toronto address · Ward 15, Don Valley West
616 Soudan Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
REVISION - as per the drawingsHVAC - Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Nov 23, 2020 · issued Dec 2, 2020 · completed Feb 11, 2021 · Permit 20 113140 HVA (revision 01)
- Closed
Plumbing
Rev 1: Replace existing drain with new drainsPlumbing - Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Sep 1, 2020 · issued Sep 3, 2020 · completed Feb 11, 2021 · Permit 20 113140 PLB (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Feb 6, 2020 · issued Feb 24, 2020 · completed Feb 11, 2021 · Permit 20 113140 HVA
- Closed
Plumbing
Plumbing - Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Feb 6, 2020 · issued Feb 19, 2020 · completed Feb 11, 2021 · Permit 20 113140 PLB
- Closed
Small residential project · Multiple projects
Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Feb 6, 2020 · issued Feb 19, 2020 · completed Feb 12, 2021 · Permit 20 113140 BLD
- Closed
Drains and site services
Drain - Proposal for a full renovation to the entire dwelling with the construction of a new full second floor.
Applied Feb 6, 2020 · issued Feb 19, 2020 · completed Feb 11, 2021 · Permit 20 113140 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition to the existing dwelling.
Decision: Approved (hearing Jun 20, 2019)
Filed Apr 29, 2019 · File A0303/19NY
What’s planned nearby
Development sites within 500 m
- Under review
35 storeys · 373 homes · Mixed use
180 m away · Site plan · Under review · filed Oct 25, 2022
- Under review
61-67 Mann Avenue and 589-593 Eglinton Avenue East
35 storeys · 389 homes · Mixed use
200 m away · Site plan · Under review · filed Nov 4, 2022
- Approved
537-551 Eglinton Avenue East and 59-61 Hoyle Avenue
35 storeys · 383 homes · Mixed use
260 m away · Rezoning · Approved · filed Dec 31, 2025
- Under review
537-547 Eglinton Avenue East and 59-61 Hoyle Avenue
25 storeys · 300 homes · Mixed use
270 m away · Site plan · Under review · filed Apr 12, 2022
- Under appeal
23 storeys · 128 homes · Residential
270 m away · Rezoning · Under appeal · filed Oct 29, 2021
- Under review
45 storeys · Mixed use
290 m away · Rezoning · Under review · filed Jun 15, 2026
Neighbours’ Committee of Adjustment files within 250 m
73 Fleming Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a second storey addition above the existing integral garage, which is proposed to be converted into habitable space.
210 m away · filed Aug 31, 2026 · Hearing scheduled
589 Eglinton Ave E · Minor variance
The proposal seeks approval for a 47 storey mixed-use residential building, refinements to the approved development concept, include an increase in height, adjustments to the tower massing, and design.
220 m away · filed Jun 5, 2026 · Approved
60 Fleming Cres · Minor variance
To alter the existing two-storey detached dwelling by converting a portion of the garage into liveable area.
210 m away · filed Jan 23, 2026 · Approved
1710 Bayview Ave · Minor variance
To alter the previously approved 9-storey mixed-use building, which is currently under construction. The variances are being requested to allow for a 0.3 metre increase in building height, to alter the permitted location of functional building elements on the roof and to reduce the supply of visitor parking. Cross-reference City of Toronto By-law No. 1184-2022 (Ontario Land Tribunal).
50 m away · filed Jan 6, 2025 · Approved
596 Soudan Ave · Minor variance
To construct a new three-storey detached dwelling.
80 m away · filed Oct 4, 2024 · Approved
23 Hoyle Ave · Minor variance
To construct a new duplex with an integral basement and garage. Also proposed is a front porch, rear balcony, rear deck and rear basement walkout. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 10, 2024.
150 m away · filed Aug 22, 2024 · Approved
10 Parkhurst Blvd · Minor variance
To add rear addition and a partial 3rd floor addition to an existing detached dwelling and relocate the existing garage (The application was deferred on the hearing of 29 August 2024)
130 m away · filed Jul 19, 2024 · Approved
22 Mann Ave · Minor variance
To permit a parking pad in the front yard of the subject property. Please note this application was previously deferred Thursday, February 1, 2024.
90 m away · filed Nov 27, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.