Toronto address · Ward 8, Eglinton-Lawrence
63 Lawrence Ave W
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision #01 - Changes to remove the underpinning from this scope. construct 2 storey rear addition, interior alterations, rear deck, detached garage
Applied Sep 20, 2019 · issued Oct 15, 2019 · completed Oct 22, 2020 · Permit 19 121656 BLD (revision 01)
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve
Applied Mar 4, 2019 · issued Mar 4, 2019 · completed Apr 2, 2019 · Permit 19 121443 DRN
- Closed
Heating and ventilation
HVAC - construct 2 storey rear addition, interior alterations, rear deck, detached garage
Applied Mar 4, 2019 · issued May 14, 2019 · completed Aug 24, 2020 · Permit 19 121656 HVA
- Closed
Plumbing
Plumbing - construct 2 storey rear addition, interior alterations, rear deck, detached garage
Applied Mar 4, 2019 · issued May 14, 2019 · completed Oct 22, 2020 · Permit 19 121656 PLB
- Closed
Small residential project · Multiple projects
construct 2 storey rear addition, interior alterations, rear deck, detached garage
Applied Mar 4, 2019 · issued May 14, 2019 · completed Oct 22, 2020 · Permit 19 121656 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two storey rear addition.
Decision: Approved (hearing Jul 18, 2019)
Filed May 29, 2019 · File A0386/19NY
What’s planned nearby
Development sites within 500 m
- Under review
109 homes · Residential
400 m away · Condominium · Under review · filed Oct 29, 2021
- Under appeal
9 storeys · 40 homes · Residential
400 m away · Rezoning · Under appeal · filed Mar 3, 2023
- Approved
4 storeys · 16 homes · Residential
440 m away · Site plan · Approved · filed Jun 30, 2022
Neighbours’ Committee of Adjustment files within 250 m
64 Unsworth Ave · Minor variance
To construct a new three-storey detached dwelling with a detached garage in the rear yard.
220 m away · filed Jun 12, 2026 · Approved with conditions
37 Unsworth Ave · Minor variance
To alter the existing semi-detached dwelling and convert into a duplex by constructing a rear two-storey addition with a new rear deck.
130 m away · filed Jan 14, 2026 · Approved
30 Chudleigh Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck. Please note, this application was previously deferred at the September 11, 2025 Committee of Adjustment Hearing.
60 m away · filed Jun 17, 2025 · Approved
27 Cortland Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, with a basement walk-up and a new deck. Please note, the application was previously deferred by the Committee of Adjustment on July 24, 2025.
140 m away · filed Jun 6, 2025 · Approved
44 Glengarry Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear addition and deck.
200 m away · filed Sep 12, 2024 · Approved
33 Chudleigh Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
100 m away · filed Sep 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new two storey dwelling with a rear deck, rear walkout, covered porch and window projection on the east wall.
110 m away · filed Jun 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new 2 storey detached house with integrated basement and garage
110 m away · filed Apr 21, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.