Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

68 Day Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to lower the existing basement via underpinning, and unfinished basement renovation.

    Applied Feb 28, 2025 · issued Mar 6, 2025 · completed Apr 17, 2026 · Permit 25 123238 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to lower the existing basement via underpinning, and unfinished basement renovation.

    Applied Feb 28, 2025 · issued Mar 6, 2025 · completed Apr 17, 2026 · Permit 25 123238 BLD

    Closed
  • Drains and site services

    Drain - Proposal to lower the existing basement via underpinning, and unfinished basement renovation.

    Applied Feb 28, 2025 · issued Mar 6, 2025 · completed Apr 17, 2026 · Permit 25 123238 DRN

    Closed
  • Small residential project · Garage

    Proposal to construct a rear yard detached garage.

    Applied Nov 10, 2022 · issued Apr 19, 2023 · completed Jun 26, 2023 · Permit 22 228070 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    Decision: Approved (hearing Mar 22, 2023)

    Filed Dec 12, 2022 · File A1356/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 133 Boon Ave · Minor variance

    To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).

    210 m away · filed Jun 4, 2026 · Approved

  • 75 Sellers Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).

    130 m away · filed Nov 4, 2025 · Approved

  • 3 Rosecliffe Ave · Minor variance

    To legalize and to maintain the rear one-storey addition (abutting the west portion of the existing rear one-storey east side addition), as well as the complete second storey addition. There will be a rear ground level deck with stairs. Also, to legalize and to maintain the new one-storey detached ancillary building (one-car garage) in the rear yard. These additions have been constructed without an authorized building permit(s).

    240 m away · filed May 2, 2025 · Approved

  • 135 Sellers Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition with entrance stairs on the ground floor and a complete third storey addition.

    220 m away · filed May 2, 2025 · Postponed

  • 95 Day Ave · Minor variance

    To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.

    90 m away · filed Jan 13, 2025 · Approved

  • 86 Day Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.

    50 m away · filed Jun 12, 2024 · Approved

  • 1966 Dufferin St · Minor variance

    To construct a new two-storey ancillary building (laneway suite with cantilevered second storey on the west side), in the rear yard, abutting the laneway. The existing ancillary building (detached garage) will be demolished. The existing detached two-and-one-half-storey main dwelling on the lot will remain unaltered.

    210 m away · filed Jan 22, 2024 · Approved

  • 44 Morrison Ave · Minor variance

    To legalize and to maintain the rear one-storey addition to the existing one-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.

    190 m away · filed Jun 7, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.