Toronto address · Ward 13, Toronto Centre
70 Mill St
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Multiple projects
Proposal for building envelope repairs including sealant replacement at window, door, and balcony interfaces, and concrete repairs to balconies
Applied Feb 6, 2026 · issued Mar 9, 2026 · Permit 26 114390 BLD
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for topside and through slab concrete repairs in deteriorated concrete areas, concrete injections in foundation walls, drains and brick replacements.
Applied May 14, 2024 · issued Jun 6, 2024 · Permit 24 148444 BLD
- Closed
Fire and security upgrade · Fire alarm
The existing fire alarm control panel MIRTONE M2000 to be replaced with a new MIRCOM FX-2000 fire alarm control panel. The rest of the existing fire alarm devices and wiring shall remain with no alterations
Applied Feb 3, 2020 · issued Feb 27, 2020 · completed Aug 29, 2020 · Permit 20 111406 FSU
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to unit 905 of existing apartment building.
Applied Apr 5, 2018 · issued May 10, 2018 · Permit 18 138763 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
45 storeys · 653 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 9, 2021
- Under review
370 Cherry Street and 31R Parliament Street
Not stated in the file
190 m away · Subdivision · Under review · filed Nov 4, 2021
- Under review
50 storeys · 1,016 homes · Mixed use
270 m away · Rezoning · Under review · filed May 20, 2026
- Approved
324 Cherry Street and 429 Lake Shore Boulevard East
53 storeys · 4,994 homes · Mixed use
280 m away · Rezoning · Approved · filed Jun 10, 2025
- Submitted
20 storeys · 297 homes · Residential
310 m away · Site plan · Submitted · filed Apr 16, 2026
- Approved
Neighbours’ Committee of Adjustment files within 250 m
14 Eastern Ave · Minor variance
To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.
230 m away · filed Jan 13, 2026 · Approved
55 Mill St · Consent
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
90 m away · filed Dec 30, 2025 · Approved
60 Trinity St · Consent
To obtain consent to a lease for a term in excess of 21 years.
110 m away · filed Oct 18, 2022 · Approved
425 Cherry St · Minor variance
To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).
160 m away · filed May 29, 2020 · Approved
8 Eastern Ave · Minor variance
Proposal for interior alterations to convert existing indusrial building to office.Previous address was .93-95 Trinity Street.
230 m away · filed Nov 28, 2019 · Withdrawn
391 Cherry St · Minor variance
To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.
190 m away · filed Mar 21, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.