Toronto address · Ward 9, Davenport
71 Day Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
semi detached garage
Applied Apr 7, 2009 · issued Apr 8, 2009 · completed Dec 4, 2025 · Permit 09 124300 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
133 Boon Ave · Minor variance
To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).
220 m away · filed Jun 4, 2026 · Approved
75 Sellers Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).
90 m away · filed Nov 4, 2025 · Approved
3 Rosecliffe Ave · Minor variance
To legalize and to maintain the rear one-storey addition (abutting the west portion of the existing rear one-storey east side addition), as well as the complete second storey addition. There will be a rear ground level deck with stairs. Also, to legalize and to maintain the new one-storey detached ancillary building (one-car garage) in the rear yard. These additions have been constructed without an authorized building permit(s).
210 m away · filed May 2, 2025 · Approved
135 Sellers Ave · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition with entrance stairs on the ground floor and a complete third storey addition.
200 m away · filed May 2, 2025 · Postponed
95 Day Ave · Minor variance
To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.
80 m away · filed Jan 13, 2025 · Approved
86 Day Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.
60 m away · filed Jun 12, 2024 · Approved
1966 Dufferin St · Minor variance
To construct a new two-storey ancillary building (laneway suite with cantilevered second storey on the west side), in the rear yard, abutting the laneway. The existing ancillary building (detached garage) will be demolished. The existing detached two-and-one-half-storey main dwelling on the lot will remain unaltered.
180 m away · filed Jan 22, 2024 · Approved
44 Morrison Ave · Minor variance
To legalize and to maintain the rear one-storey addition to the existing one-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.
180 m away · filed Jun 7, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.