Toronto address · Ward 19, Beaches-East York
73 Coleman Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to construct a 2 storey rear addition, basement entrance, and interior alterations to dwelling
Applied Nov 7, 2018 · issued Feb 20, 2019 · completed Aug 22, 2019 · Permit 18 253274 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a 2 storey rear addition, basement entrance, and interior alterations to dwelling
Applied Nov 7, 2018 · issued Feb 20, 2019 · completed Sep 10, 2019 · Permit 18 253274 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve.
Applied Oct 24, 2018 · issued Nov 2, 2018 · completed Mar 17, 2019 · Permit 18 247225 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 64 homes · Not stated in the file
80 m away · Site plan · Under review · filed Mar 10, 2026
- Under appeal
55 storeys · 1,139 homes · Mixed use
130 m away · Subdivision · Under appeal · filed Nov 7, 2021
- Under appeal
48 storeys · 1,050 homes · Residential
170 m away · Rezoning · Under appeal · filed Dec 21, 2022
- Approved
38 storeys · 636 homes · Mixed use
190 m away · Site plan · Approved · filed Aug 10, 2021
- Under appeal
55 storeys · 1,543 homes · Residential
250 m away · Rezoning · Under appeal · filed Aug 26, 2022
- Under review
33 storeys · 769 homes · Mixed use
250 m away · Condominium · Under review · filed Oct 28, 2021
Neighbours’ Committee of Adjustment files within 250 m
10 Dawes Rd · Minor variance
To alter the redevelopment plan for a mixed-use building consisting of two towers of 24-storeys and 38-storeys atop a shared 6-storey podium, approved under Site Specific By-law 1163-2022(OLT), by increasing the height of the south tower from 38-storeys (119 m) to 43-storeys (136.3 m), resulting in an increase in gross floor area and number of dwelling units. Also, changes to the height of the proposed podium and north tower (ranging from 0.2 to 2.3 m), and alteration to the building envelope for a portion of the rear (west) podium main wall, and a reduction in resident vehicle parking space.
240 m away · filed May 3, 2024 · Approved
2822 Danforth Ave · Minor variance
To alter the existing two-storey commercial building by constructing a partial second storey addition and a third storey addition.
220 m away · filed Mar 23, 2021 · Approved
9 Dentonia Park Ave · Consent
To obtain consent to sever the property into two residential lots.
200 m away · filed Mar 12, 2018 · Approved
9 Dentonia Park Ave · Minor variance
To construct a new two-storey semi-detached dwelling with an integral garage on the conveyed lot (Part 2) described in consent application B0029/18TEY.
200 m away · filed Mar 12, 2018 · Approved
9 Dentonia Park Ave · Minor variance
To construct a new two-storey semi-detached dwelling with an integral garage on the retained lot (Part 1) described in consent application B0029/18TEY.
200 m away · filed Mar 12, 2018 · Approved
2575 Danforth Ave · Minor variance
To alter the existing 22-storey mixed-use Building B containing ground floor commercial uses, by constructing a front and east side one-storey commercial addition.
230 m away · filed May 9, 2017 · Approved
2766 Danforth Ave · Consent
To obtain consent to the technical severance of the property for the purpose of re-establishing the two lots which merged on title.
110 m away · filed Aug 7, 2015 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.