Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

76 Wade Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow preventer in an existing repair garage

    Applied Apr 14, 2016 · issued Apr 19, 2016 · completed Dec 19, 2018 · Permit 16 140391 PSA

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 763 Lansdowne Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.

    160 m away · filed Aug 26, 2025 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    160 m away · filed May 6, 2025 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    200 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    230 m away · filed Dec 12, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    200 m away · filed Jun 1, 2023 · Approved

  • 83 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a complete third storey addition. Also, to construct a rear one-storey ancillary building (office space).

    200 m away · filed Nov 3, 2022 · Approved

  • 109 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

    200 m away · filed Nov 3, 2022 · Approved

  • 57 Wade Ave · Minor variance

    To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.

    140 m away · filed Jun 27, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.