Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

761 Dundas St E

The City of Toronto has 8 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 3rd and 4th floor of an existing auto repair shop and dealership.4th Floor - Expand the service shop area into the parts storage area and move the automotive parts storage area down to the 3rd floor.

    Applied Jul 9, 2025 · issued Aug 12, 2025 · Permit 25 190945 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations to the 3rd and 4th floor of an existing auto repair shop and dealership.4th Floor - Expand the service shop area into the parts storage area and move the automotive parts storage area down to the 3rd floor.

    Applied Jul 9, 2025 · issued Aug 12, 2025 · Permit 25 190945 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 3rd and 4th floor of an existing auto repair shop and dealership.4th Floor - Expand the service shop area into the parts storage area and move the automotive parts storage area down to the 3rd floor.

    Applied Jul 9, 2025 · issued Aug 12, 2025 · Permit 25 190945 BLD

    Permit issued
  • Designated structure · Sign building permit related

    In conjunction with an auto dealership on the premises, proposal to erect and display one illuminated ground sign, located on the north frontage of the property. The proposed ground sign contains two sign faces, each measuring 7.47 metres vertically by 1.60 metres horizontally at a height of 7.47m.**Mercedes-Benz Canada**

    Applied Oct 14, 2016 · issued May 15, 2017 · completed Jul 24, 2017 · Permit 16 237360 DST

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Make alterations and construct addition.

    Applied Jun 26, 2007 · issued Jul 6, 2007 · completed Jun 15, 2022 · Permit 05 174846 STS

    Closed
  • Heating and ventilation

    HVAC - Enlarged addition on West side of existing Car dealership/repair garage.

    Applied Jun 26, 2007 · issued Oct 23, 2007 · completed Jun 27, 2022 · Permit 07 235853 HVA

    Closed
  • Plumbing

    Plumbing - Make alterations and construct addition

    Applied Aug 9, 2006 · issued Jan 15, 2007 · completed Jun 15, 2022 · Permit 05 174846 PLB

    Closed
  • Heating and ventilation

    HVAC - Make alterations and construct addition

    Applied Aug 9, 2006 · issued Jan 15, 2007 · completed Jun 24, 2022 · Permit 05 174846 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 111 River St · Minor variance

    To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a t…

    120 m away · filed Sep 23, 2025 · Approved

  • 131 River St · Minor variance

    To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

    120 m away · filed Sep 12, 2025 · Approved

  • 83 River St · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.

    180 m away · filed May 1, 2024 · Approved

  • 150 River St · Consent

    To obtain consent to create two easements/right-of-ways.

    220 m away · filed Nov 4, 2021 · Approved

  • 25 Nicholas Ave · Minor variance

    To alter the development proposal for a 28-storey mixed-use building including a four to six-storey podium and 24 three-storey back-to-back townhouses by permitting 11 undersized parking spaces.

    230 m away · filed Mar 17, 2021 · Approved

  • 7 Labatt Ave · Minor variance

    To alter the mixed-use redevelopment scheme approved under Site-Specific By-laws 1255-2017 and 1256-2017 by reconfiguring the overall massing of the building and reducing the number of parking spaces.

    190 m away · filed Dec 13, 2019 · Approved

  • 50 Carroll St · Minor variance

    To alter the existing three-storey mixed-use building by converting 1,511 m2 of existing vacant space into office space and 294 m2 into an ancillary restaurant use; and to legalize the existing one-storey west side addition associated with the restaurant use.

    240 m away · filed Jul 16, 2019 · Approved

  • 25 Nicholas Ave · Consent

    To obtain consent to sever to create two residential lots and various easements/rights-of-way.

    230 m away · filed Mar 15, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.