Toronto address · Ward 10, Spadina-Fort York
77 Grange Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior and exterior renovations.
Applied Jan 2, 2025 · issued Jun 30, 2025 · Permit 25 100225 BLD
- Inspections under way
Heating and ventilation
Hvac - proposed interior and exterior renovations.
Applied Jan 2, 2025 · issued Jun 30, 2025 · Permit 25 100225 HVA
- Inspections under way
Plumbing
Plumbing - PROPOSED INTERIOR AND EXTERIOR RENOVATIONS.
Applied Jan 2, 2025 · issued Jun 30, 2025 · Permit 25 100225 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Now selling
- Approved
19 storeys · Not stated in the file
250 m away · Site plan · Approved · filed Dec 21, 2021
- Approved
5 storeys · 22 homes · Residential
330 m away · Rezoning · Approved · filed Oct 15, 2024
- Under review
19 storeys · 117 homes · Mixed use
410 m away · Site plan · Under review · filed Dec 29, 2022
- Under review
25 storeys · 223 homes · Mixed use
450 m away · Site plan · Under review · filed Nov 10, 2021
- Under review
19 storeys · 140 homes · Mixed use
460 m away · Site plan · Under review · filed Feb 1, 2023
Neighbours’ Committee of Adjustment files within 250 m
52 Phoebe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).
220 m away · filed Jan 12, 2026 · Approved
184 Spadina Ave · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 762-2023) for a new 14 and 15-storey hotel building (east tower fronting Spadina Avenue, and west tower fronting Cameron Street), connected by a one-storey (with mezzanine) base building, which is currently under construction. To permit the increase of non-residential gross floor area, and the west building height from 15-storeys to 19-storeys tower (44.4 m to 57 m), and to alter the building setbacks. A related Site Plan Control (under File Number 20 21 250663 STE 10 SA) is approved with conditions. There will…
250 m away · filed Aug 25, 2025 · Refused
50 Phoebe St · Minor variance
To construct a front basement walkout with stairs.
220 m away · filed Nov 19, 2024 · Approved
571 Dundas St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 841-2020) for a new 15-storey mixed-use building on Site 1 - Phase 2A, (which is currently under construction), by increasing the building height. There will be a total of 188 residential dwelling units within this building.
190 m away · filed Aug 15, 2024 · Approved
53 Sullivan St · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a two-storey ancillary building (containing one laneway suite), in the rear yard abutting the laneway, and fronting Huron Street. There will be a total of three residential dwelling units (two units within the main dwelling and one unit within the ancillary building) on this lot. The existing attached garage will be demolished.
240 m away · filed Mar 13, 2024 · Approved
15 Glen Baillie Pl · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear second storey cantilevered addition and a rear second storey deck.
240 m away · filed Mar 27, 2023 · Approved
49 Grange Ave · Minor variance
To convert the basement and first storey from a personal service shop to a second dwelling unit.
240 m away · filed May 7, 2021 · Postponed
77 Sullivan St · Minor variance
To alter the existing three-storey townhouse by constructing a rear third storey addition, rear second storey deck and reconstructing the rear first storey addition.
190 m away · filed Mar 24, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.