Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

77 Millicent St

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Proposal to carry out interior alterations to convert the existing converted dwelling containing one secondary suite to a converted dwelling containing two secondary suites, to archive a total of three (3) dwelling units within the existing semi-detached dwelling.

    Applied Apr 1, 2022 · completed Oct 26, 2022 · 1 home added · Permit 22 129361 BLD

    Cancelled
  • Plumbing

    Plumbing - EXISTING DUPLEX TO REMAIN- ADD ADDITIONAL RESIDENTIAL UNIT-PROPOSED TRIPLEX

    Applied Apr 1, 2022 · completed Oct 26, 2022 · Permit 22 129361 PLB

    Cancelled
  • Heating and ventilation

    Rev 01: REVISIONS TO EXISTING HVAC PERMIT # 19 142106 HVAC 00 for unit #1 and unit #2.HVAC - Interior alterations to convert existing dwelling into two units, including new hvac system - Unit 1- basement and Unit 2 - main and second floor

    Applied Nov 24, 2019 · completed Dec 3, 2019 · Permit 19 142106 HVA (revision 01)

    Cancelled
  • Small residential project · Interior alterations

    Revision 01. Interior alterations to convert existing dwelling into two units, including new hvac system - Unit 1- basement and Unit 2 - main and second floor

    Applied Oct 10, 2019 · issued Oct 24, 2019 · completed Mar 28, 2022 · Permit 19 142106 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Interior alterations to convert existing dwelling into two units, including new hvac system - Unit 1- basement and Unit 2 - main and second floor

    Applied Apr 18, 2019 · issued Apr 30, 2019 · completed Jan 17, 2025 · Permit 19 142106 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to convert existing dwelling into two units, including new hvac system - Unit 1- basement and Unit 2 - main and second floor

    Applied Apr 18, 2019 · issued May 13, 2019 · completed Mar 28, 2022 · Permit 19 142106 HVA

    Closed
  • Small residential project · Interior alterations

    Interior alterations to convert existing dwelling into two units, including new hvac system - Unit 1- basement and Unit 2 - main and second floor

    Applied Apr 18, 2019 · issued Apr 30, 2019 · completed Mar 28, 2022 · 1 home added · Permit 19 142106 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 45 Armstrong Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.

    120 m away · filed May 15, 2026 · Approved

  • 80 Armstrong Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (two-car garage, abutting the laneway) by constructing a complete second storey addition (cantilevered at the south side of the building), to contain one laneway suite. There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    70 m away · filed Mar 3, 2026 · Approved

  • 10 Millicent St · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition along a portion of the south side wall, to contain a lounge area and bathroom.

    220 m away · filed Dec 4, 2025 · Approved

  • 750 Brock Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.

    230 m away · filed Sep 12, 2025 · Approved

  • 172 Emerson Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition (removing the existing attic and dormers). The existing gutter at the third storey level will be maintained and unaltered. Also, to reconstruct the existing rear one-storey addition.

    200 m away · filed Jul 9, 2025 · Approved

  • 107 Lappin Ave · Minor variance

    To permit a portion of the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) from the abutting westerly property, municipally known as 109 Lappin Avenue (as approved under Committee of Adjustment File A0465/24TEY), which encroaches onto this lot. Also, the existing garage height, gable roof, and eaves will be maintained and unaltered.

    140 m away · filed Jun 2, 2025 · Approved

  • 27 Millicent St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck (green rooftop on second level) and stairs, a complete third storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (containing a garage on the ground level and one laneway suite on the second level), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    140 m away · filed Apr 2, 2025 · Approved

  • 98 Millicent St · Minor variance

    To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).

    60 m away · filed Jan 27, 2025 · Postponed

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.