Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

80 Cooperage St

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    In conjunction with a multi-storey building for a student residence on the George Brown College campus, proposal to erect and display one illuminated overhanging structure sign and one illuminated wall sign displaying static copy on the first storey east elevation. The proposed overhanging structure sign is 0.76 metres vertically by 5.18 metres horizontally at a height of 4.5 metres above grade. The proposed wall sign is 1.49 metres vertically by 0.76 metres horizontally at a height of 2.71 metres above grade.**George Brown************FAST TRACK********

    Applied Sep 30, 2016 · issued Oct 31, 2016 · completed Mar 5, 2018 · Permit 16 231266 DST

    Closed
  • Designated structure · Sign building permit related

    In conjunction with a multi-storey building containing a conference room at the George Brown College campus, proposal to erect and display one illuminated wall sign displaying static copy on the second storey east elevation. The proposed sign is 0.51 metres vertically by 11.3 metres horizontally at a height of 8.5 metres above grade.**George Brown****FAST TRACK**

    Applied Sep 30, 2016 · issued Oct 31, 2016 · completed Mar 5, 2018 · Permit 16 231312 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    210 m away · filed Jun 6, 2024 · Approved

  • 425 Cherry St · Minor variance

    To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

    150 m away · filed May 29, 2020 · Approved

  • 457 Front St E · Minor variance

    To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.

    110 m away · filed Nov 8, 2019 · Approved

  • 507 King St E · Minor variance

    To alter the existing four-storey mixed-use building by performing interior renovations to support office uses, by creating an open rooftop amenity space, and by constructing a rear fourth storey amenity space addition and front and rear fourth storey additions for rooftop access via stair and elevator.

    200 m away · filed Oct 4, 2019 · Approved

  • 22 Sackville St · Minor variance

    To permit the existing two-storey building to be used for an industrial catering service and a takeout restaurant with ancillary office space.

    230 m away · filed Apr 9, 2018 · Approved

  • 475 Front St E · Minor variance

    To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.

    180 m away · filed Mar 20, 2018 · Approved

  • 3 Percy St · Minor variance

    To alter the existing two-storey rowhouse by re-constructing the rear one-storey addition.

    250 m away · filed Feb 21, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.