Toronto address · Ward 3, Etobicoke-Lakeshore
83 Fifth St
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
Three storey dwelling with attached garage with rear deck and third floor balcony
Applied Feb 17, 2022 · issued Jun 8, 2022 · completed Jan 2, 2025 · 1 home added · Permit 22 115031 BLD
- Closed
Plumbing
Plumbing - Three storey dwelling with attached garage with rear deck and third floor balcony
Applied Feb 17, 2022 · issued Jun 8, 2022 · completed Dec 3, 2024 · Permit 22 115031 PLB
- Closed
Demolition
Demolish the existing one storey dwelling
Applied Feb 17, 2022 · issued Jun 8, 2022 · completed Dec 8, 2022 · 1 home removed · Permit 22 115038 DEM
- Closed
Drains and site services
Drain - Three storey dwelling with attached garage with rear deck and third floor balcony
Applied Feb 17, 2022 · issued Jun 8, 2022 · completed Dec 3, 2024 · Permit 22 115031 DRN
- Closed
Heating and ventilation
HVAC - Three storey dwelling with attached garage with rear deck and third floor balcony
Applied Feb 17, 2022 · issued Jun 8, 2022 · completed Dec 3, 2024 · Permit 22 115031 HVA
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install backwater valve.
Applied Jun 14, 2018 · issued Jun 14, 2018 · completed Oct 4, 2018 · Permit 18 178164 DRN
- Closed
Small residential project · Multiple projects
Interior alt. (relocated bdrm), new win. At rear elevation, new rear deck & new rear shed
Applied Apr 9, 2015 · issued Apr 29, 2015 · completed Oct 4, 2018 · Permit 15 138500 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Jul 29, 2021)
Filed Jun 6, 2021 · File A0320/21EYK
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · Not stated in the file
260 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
250 m away · filed Apr 11, 2025 · Refused
38 Third St · Minor variance
To construct a new duplex with an attached garage.
180 m away · filed Dec 27, 2024 · Approved
38 Third St · Minor variance
To construct a new duplex with an attached garage.
180 m away · filed Dec 27, 2024 · Approved
38 Third St · Consent
To obtain consent to sever the property into two undersized residential lots.
180 m away · filed Dec 24, 2024 · Approved
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
240 m away · filed May 29, 2024 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.
250 m away · filed May 21, 2024 · Approved
118 Fifth St · Minor variance
To legalize and to maintain the garden suite that is currently under construction.
160 m away · filed Dec 4, 2023 · Refused
45 Fourth St · Minor variance
To construct a two-storey front addition and a new front porch.
110 m away · filed Aug 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.