Toronto address · Ward 3, Etobicoke-Lakeshore
83 Twenty Seventh St
The City of Toronto has 5 building permits since 2017 and 4 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Plumbing
Plumbing - Construct new two storey detached dwelling, intergal garage, front porch and rear deck
Applied Apr 12, 2022 · issued Aug 25, 2022 · completed Oct 20, 2025 · Permit 22 129650 PLB
- Cancelled
Drains and site services
Drain - Construct new two storey detached dwelling, intergal garage, front porch and rear deck
Applied Apr 12, 2022 · issued Aug 25, 2022 · completed Oct 20, 2025 · Permit 22 129650 DRN
- Cancelled
Heating and ventilation
HVAC - Construct new two storey detached dwelling, intergal garage, front porch and rear deck
Applied Apr 1, 2022 · issued Aug 25, 2022 · completed Oct 20, 2025 · Permit 22 129650 HVA
- Cancelled
New house · New building
Construct new two storey detached dwelling, intergal garage, front porch and rear deck
Applied Apr 1, 2022 · issued Aug 25, 2022 · completed Oct 20, 2025 · 1 home added · Permit 22 129650 BLD
- Cancelled
Demolition
Demolish existing dwelling and construct a new two storey detached dwelling
Applied Apr 1, 2022 · issued Aug 25, 2022 · completed Oct 20, 2025 · 1 home removed · Permit 22 129669 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Accepted
Consent · Sever lot
To obtain consent to sever the property into two undersized residential lots.
Filed Nov 5, 2025 · File B0046/25EYK
- Accepted
Minor variance · New R building
To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.
Filed Nov 5, 2025 · File A0429/25EYK
- Accepted
Minor variance · New R building
To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.
Filed Nov 5, 2025 · File A0430/25EYK
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Mar 9, 2021)
Filed Dec 24, 2020 · File A0010/21EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
21 Arcadian Crcl · Minor variance
To construct a new detached dwelling with an attached garage.
220 m away · filed Jul 7, 2026 · Tentatively scheduled
84 Alder Cres · Minor variance
110 m away · filed May 11, 2026 · Postponed
12 Meaford Ave · Minor variance
To construct a second-storey addition above the existing dwelling.
150 m away · filed Apr 10, 2026 · Approved
31 Elton Cres · Minor variance
To construct a new detached garage in the rear yard.
230 m away · filed Dec 8, 2025 · Approved
29 Arcadian Crcl · Minor variance
To construct a new detached multiplex containing two dwelling units with an attached garage.
190 m away · filed Oct 29, 2025 · Deferred
29 Arcadian Crcl · Minor variance
To construct a new detached multiplex containing two dwelling units with an attached garage.
190 m away · filed Oct 29, 2025 · Deferred
29 Arcadian Crcl · Consent
To obtain consent to sever the lot into two undersized residential lots and to construct a new detached multiplex containing two dwelling units with an attached garage on each new lot.
190 m away · filed Oct 29, 2025 · Deferred
25 Arcadian Crcl · Minor variance
To construct a new detached dwelling with an attached garage.
200 m away · filed Feb 4, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.