Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

84 Alder Cres

The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposed second floor addition heated extension, interior alterations and convertting the single family dwelling to 4 units dwelling

    Applied Sep 4, 2025 · 3 homes added · Permit 25 220395 BLD

    Examiner's notice sent

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    Filed May 11, 2026 · File A0216/26EYK

    Postponed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 12 Meaford Ave · Minor variance

    To construct a second-storey addition above the existing dwelling.

    90 m away · filed Apr 10, 2026 · Approved

  • 83 Twenty Seventh St · Consent

    To obtain consent to sever the property into two undersized residential lots.

    110 m away · filed Nov 5, 2025 · Accepted

  • 83 Twenty Seventh St · Minor variance

    To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.

    110 m away · filed Nov 5, 2025 · Accepted

  • 83 Twenty Seventh St · Minor variance

    To construct a new semi-detached dwelling with an attached garage and a secondary suite in the basement.

    110 m away · filed Nov 5, 2025 · Accepted

  • 121 Twenty Seventh St · Minor variance

    To construct a new detached fourplex and a garden suite in the rear yard.

    170 m away · filed Mar 15, 2024 · Deferred

  • 121 Twenty Seventh St · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    170 m away · filed Mar 15, 2024 · Deferred

  • 121 Twenty Seventh St · Minor variance

    To construct a new detached fourplex and a garden suite in the rear yard.

    170 m away · filed Mar 15, 2024 · Deferred

  • 40 Twenty Third St · Minor variance

    To construct a new detached dwelling with a new detached garage.

    250 m away · filed Oct 12, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.