Toronto address · Ward 3, Etobicoke-Lakeshore
84 Ninth St
The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Interior alterations at main floor, removal of load bearing walls - 55.18m2
Applied Mar 24, 2026 · issued Apr 1, 2026 · Permit 26 133776 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations at main floor, removal of load bearing walls - 55.18m2
Applied Mar 24, 2026 · issued Apr 1, 2026 · Permit 26 133776 PLB
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve in main line.
Applied May 18, 2017 · issued May 19, 2017 · completed May 24, 2017 · Permit 17 162400 DRN
- Closed
Small residential project · Garage
Det. Garage to single family dwelling
Applied May 14, 1997 · issued May 21, 1997 · completed Sep 15, 2025 · Permit 97 083553 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
99 Birmingham Street and 210 Islington Avenue
26 storeys · 352 homes · Mixed use
490 m away · Rezoning · Under appeal · filed Nov 23, 2023
Neighbours’ Committee of Adjustment files within 250 m
73 Tenth St · Minor variance
To construct a one-storey rear addition and a new rear deck.
40 m away · filed Dec 2, 2025 · Approved
115 Tenth St · Minor variance
To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.
160 m away · filed Oct 14, 2025 · Approved
46 Tenth St · Minor variance
To maintain the existing front porch that is currently uncer construction.
150 m away · filed Sep 26, 2025 · Approved
84 Tenth St · Minor variance
To construct a second and third storey addition above the existing dwelling.
90 m away · filed Apr 29, 2025 · Approved
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
250 m away · filed Apr 11, 2025 · Refused
100 Tenth St · Minor variance
To construct a one-storey vestibule addition along the front wall of the existing place of worship to accommodate an elevator.
130 m away · filed Dec 4, 2024 · Approved
69 Tenth St · Minor variance
To construct a two-storey rear addition including a deck in the rear yard.
60 m away · filed Aug 9, 2024 · Approved
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
230 m away · filed May 29, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.