Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

85 Combe Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Revision 01: Revised elevations as per bubbled drawings.Proposed second storey addition (89.2m2) over existing one storey single family detached dwelling.

    Applied Aug 22, 2017 · issued Aug 29, 2017 · completed Nov 2, 2017 · Permit 17 157194 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed second storey addition (89.2m2) over existing one storey single family detached dwelling.

    Applied Aug 4, 2017 · issued Aug 9, 2017 · completed Nov 2, 2017 · Permit 17 157194 HVA

    Closed
  • Plumbing

    Plumbing - Proposed second storey addition (89.2m2) over existing one storey single family detached dwelling.

    Applied May 10, 2017 · issued Jun 12, 2017 · completed Nov 2, 2017 · Permit 17 157194 PLB

    Closed
  • Small residential project · Addition(s)

    Proposed second storey addition (89.2m2) over existing one storey single family detached dwelling.

    Applied May 10, 2017 · issued Jun 12, 2017 · completed Nov 2, 2017 · Permit 17 157194 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    INstall (1) inside backwater valve and sump pump

    Applied Oct 28, 2013 · issued Oct 28, 2013 · completed May 31, 2017 · Permit 13 257290 000

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 183 Brighton Ave · Minor variance

    Proposal to construct second storey addition, new front porch and rear roof canopy onto existing dwelling.

    190 m away · filed Dec 6, 2022 · Approved

  • 104 Combe Ave · Minor variance

    To construct a new dwelling.

    140 m away · filed Jan 26, 2022 · Approved

  • 81 Combe Ave · Minor variance

    To construct a first and second storey addition to the side of the existing dwelling.

    40 m away · filed Jun 9, 2021 · Approved

  • 81 Combe Ave · Minor variance

    Proposed interior alterations and 2-storey addition to an existing single family detached dwelling.

    40 m away · filed Oct 16, 2020 · Refused

  • 153 Brighton Ave · Minor variance

    To construct a front two-storey addition, in conjunction with a second storey addition over the existing dwelling.

    240 m away · filed Sep 11, 2019 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.