Toronto address · Ward 3, Etobicoke-Lakeshore
85 Paulart Dr
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct second floor addition over existing (1) storey and two storey rear addition, underpining of existing foundation at rear, interior alteration, concrete covered porch to west side with cold room below, front and rear uncovered decks and detached garage to rear.
Applied Oct 31, 2011 · issued Jan 31, 2012 · Permit 11 255079 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to construct second floor addition over existing (1) storey and two storey rear addition, underpining of existing foundation at rear, interior alteration, concrete covered porch to west side with cold room below, front and rear uncovered decks and detached garage to rear.
Applied Aug 12, 2011 · issued Sep 12, 2011 · Permit 11 255079 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to construct second floor addition over existing (1) storey and two storey rear addition, underpining of existing foundation at rear, interior alteration, concrete covered porch to west side with cold room below, front and rear uncovered decks and detached garage to rear.
Applied Aug 11, 2011 · issued Sep 12, 2011 · Permit 11 255079 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
6 storeys · 52 homes · Residential
370 m away · Site plan · Under review · filed Dec 29, 2025
Neighbours’ Committee of Adjustment files within 250 m
33 Statler Ave · Minor variance
To construct a new detached dwelling with an attached garage.
140 m away · filed Jun 2, 2026 · Approved
57 Silverhill Dr · Minor variance
To legalize and to maintain the rear second storey platform.
220 m away · filed May 21, 2024 · Approved
42 Shaver Ave S · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0521/19EYK) approved a variance relating to gross floor area.
250 m away · filed Nov 14, 2022 · Approved
57 Silverhill Dr · Minor variance
To construct a second storey above the existing dwelling, a new front porch and a new covered rear deck.
220 m away · filed Aug 23, 2021 · Approved
29 Greenfield Dr · Minor variance
To construct a new rear ancillary structure (cabana).
240 m away · filed Jul 30, 2021 · Approved
3972 Bloor St W · Minor variance
To maintain the existing detached dwelling and to construct a detached garage in the rear yard.
180 m away · filed Aug 17, 2020 · Approved
3972 Bloor St W · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Aug 17, 2020 · Approved
3972 Bloor St W · Consent
To obtain consent to sever the property into two undersized residential lots.
180 m away · filed Aug 17, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.