Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

86 Gerrard St E

The City of Toronto has 19 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    Balcony solarium demolition approx 75 sq m (floor area) and installation of balcony waterproofing, localized concrete curb/slab edge repairs approx 5 sq m (vertical surface) and localized concrete coating installation approx 5 sq m (vertical surface). Wholesale window replacement approx 2360 sq m (opening area), balcony solarium (sun room) replacement approx 60 sq m (floor area).

    Applied Jan 21, 2025 · issued Mar 5, 2025 · Permit 25 107032 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Revision 02: Proposal to revise proposed smoke detectors name to smoke alarms

    Applied Feb 6, 2023 · issued Feb 6, 2023 · completed Feb 21, 2023 · Permit 19 180339 BLD (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision 01: Proposal to use battery powered wireless interconnected smoke alarms

    Applied Nov 29, 2022 · issued Dec 14, 2022 · completed Feb 21, 2023 · Permit 19 180339 BLD (revision 01)

    Closed
  • Heating and ventilation

    REV #1-REMOVE HRVHVAC - Proposal for interior alterations to unit 18B of existing residential condo

    Applied Mar 31, 2022 · issued May 3, 2022 · completed May 5, 2022 · Permit 19 180339 HVA (revision 01)

    Closed
  • Addition or alteration · Other

    Proposal for rehabilitation of the existing podium deck and courtyard for existing condo

    Applied Oct 16, 2019 · issued Nov 14, 2019 · completed Aug 27, 2025 · Permit 19 237129 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to unit 18B of existing residential condo

    Applied Jun 28, 2019 · issued Aug 13, 2019 · completed May 5, 2022 · Permit 19 180339 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to unit 18B of existing residential condo

    Applied Jun 28, 2019 · issued Aug 13, 2019 · completed Mar 22, 2022 · Permit 19 180339 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to unit 18B of existing residential condo

    Applied Jun 28, 2019 · issued Aug 13, 2019 · completed Feb 21, 2023 · Permit 19 180339 BLD

    Closed
  • Addition or alteration · Other

    Proposal for hydro vault rehabilitation to an existing mixed use building.

    Applied May 8, 2019 · issued Jun 10, 2019 · completed Aug 27, 2025 · Permit 19 151309 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to unit 16D to convert a two bedroom to a 3 bedroom apartment in existing multiple unit building.

    Applied Jan 5, 2018 · issued Feb 5, 2018 · completed Mar 2, 2018 · Permit 18 101794 BLD

    Closed
  • Plumbing · Fixtures/Roof Drains: other

    Proposal to install a new double sink, hand sink and coffe machine in an existing ground floor restaurant, less than 30 seats - Unit 100

    Applied Sep 27, 2017 · issued Oct 18, 2017 · completed Jan 17, 2018 · Permit 17 239606 PSA

    Closed
  • Addition or alteration · Interior alterations

    REVISION: Proposal for lobby alterations to convert previous fire-rated wall to glazing. Scope of work also includes fire rating mechanical room with 2 hour separation. Interior alterations to the lobby of the existing office building

    Applied Jun 19, 2017 · issued Jul 26, 2017 · completed Aug 17, 2026 · Permit 15 171254 BLD (revision 01)

    Closed
Show 7 more permits
  • Plumbing

    Plumbing - Interior alterations to the lobby of the existing office building

    Applied Feb 8, 2017 · issued Mar 17, 2017 · Permit 15 171254 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to the lobby of the existing office building

    Applied Feb 8, 2017 · issued Mar 17, 2017 · Permit 15 171254 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to the lobby of the existing office building

    Applied Jun 9, 2015 · issued May 26, 2016 · completed Aug 17, 2026 · Permit 15 171254 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device in an existing residential condo building with ground floor retail.

    Applied Jun 22, 2010 · issued Jul 19, 2010 · Permit 10 203369 PSA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alterations to convert storage room into residential suite on 2nd. floor.Exisiting: 57 dwelling units Proposed: Add one dwelling unit (58 dwelling units)See C.of A. Decision A0016/04T, Oct. 15/04

    Applied Apr 6, 2004 · issued Dec 17, 2004 · completed Sep 2, 2025 · 1 home added · Permit 04 123023 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to convert storage room into residential suite - Interior Alterations

    Applied Apr 6, 2004 · issued Dec 17, 2004 · Permit 04 123023 PLB

    Inspections under way
  • Addition or alteration · Balcony/Guard repairs

    Balcony repairs on front elevation (22 balconies)

    Applied May 13, 2003 · issued May 21, 2003 · Permit 03 132423 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 50 Gerrard St E · Consent

    To obtain consent to sever a portion of stratified land (air-rights above an elevation of 121 m) for the purpose of a lot addition.

    120 m away · filed May 15, 2026 · Postponed

  • 296 Jarvis St · Minor variance

    To alter the existing 18-storey mixed-use building (as approved under Site Specific Zoning By-law 298-88) by converting the existing service and retail office floor area on the first storey, and the hotel conference and banquet room floor areas on the second storey into a hotel with 50 guest suites. The existing second storey bridge connecting to 300 Jarvis Street will be demolished..

    140 m away · filed Jul 22, 2025 · Postponed

  • 97 Granby St · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    110 m away · filed Jun 18, 2025 · Approved

  • 145 Mutual St · Minor variance

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    190 m away · filed Aug 28, 2024 · Approved

  • 111 Carlton St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements.

    210 m away · filed Mar 12, 2024 · Approved

  • 50 Gerrard St E · Minor variance

    To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.

    120 m away · filed Nov 14, 2023 · Approved

  • 109 1/2 Granby St · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    110 m away · filed Dec 7, 2021 · Approved

  • 64 McGill St · Minor variance

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    180 m away · filed Oct 6, 2021 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.