Toronto address · Ward 3, Etobicoke-Lakeshore
860 Royal York Rd
The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a rear one-storey addition and interior alterations to existing one-storey detached dwelling.
Applied Nov 12, 2018 · issued Dec 4, 2018 · Permit 18 255392 HVA
- Inspections under way
Small residential project · Addition(s)
Proposal to construct a rear one-storey addition and interior alterations to existing one-storey detached dwelling.
Applied Nov 12, 2018 · issued Nov 19, 2018 · Permit 18 255392 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve & clean-out for SFD.
Applied Apr 30, 2018 · issued May 9, 2018 · completed Jun 25, 2018 · Permit 18 150776 DRN
- Inspections under way
Small residential project · Interior alterations
Application to alter the existing washroom in the basement of the existing house for wheelchair access.
Applied Sep 22, 2016 · issued Sep 30, 2016 · Permit 16 227154 BLD
- Inspections under way
Plumbing
Plumbing - Application to alter the existing washroom in the besetment of the existing house for wheelchair access.
Applied Sep 22, 2016 · issued Sep 30, 2016 · Permit 16 227154 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey rear addition.
Decision: Approved (hearing Sep 27, 2018)
Filed Aug 1, 2018 · File A0607/18EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
32 Orchard Cres · Minor variance
To convert the existing attached garage into habitable space.
170 m away · filed Apr 17, 2026 · Approved
95 Thompson Ave · Minor variance
To construct a second storey addition above the existing dwelling and a new one-storey front addition.
240 m away · filed Sep 16, 2025 · Approved
142 Thompson Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front platform, and a new deck in the rear yard.
190 m away · filed Jul 11, 2025 · Approved
7 Edgemore Dr · Minor variance
To construct a partial second storey addition.
110 m away · filed Jun 13, 2025 · Approved
137 Thompson Ave · Minor variance
To construct a one-storey east side addition above the existing attached garage and a covered deck in the rear yard.
170 m away · filed Apr 15, 2025 · Approved
1 Orchard Cres · Minor variance
To construct a new detached dwelling with an attached garage.
50 m away · filed Oct 9, 2024 · Approved
19 Edgemore Dr · Minor variance
To construct a two-storey rear addition.
180 m away · filed Jul 30, 2024 · Approved
79 Brentwood Rd S · Minor variance
To construct a second storey addition above the existing dwelling, a covered rear yard deck and a detached garage in the rear yard. The existing detached garage in the rear yard will be demolished.
220 m away · filed May 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.