Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

873 St Clarens Ave

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    Construct a detached garage at the rear.

    Applied Sep 12, 2003 · issued Oct 8, 2003 · Permit 03 174329 BLD

    Inspections under way
  • Heating and ventilation

    HVAC -supply and install h.v.a.c. system.

    Applied Dec 5, 2001 · issued Dec 11, 2001 · completed Jun 8, 2026 · Permit 01 188993 HVA

    Closed (dormant)
  • Small residential project · Multiple projects

    make interior alterations, construct 1 storey addition at rear, reconstruct front verandah with cold storage under, uncovered platform on south elevation.

    Applied Oct 24, 2001 · issued Oct 24, 2001 · 1 home added · Permit 01 188993 BLD

    Inspections under way
  • Plumbing

    Plumbing - install fixtures in basement- 1 w.c., 1 w.b., 1 b.t., 1 w.m., 1 l.t., 1 h.w.t., 1 2-compt. k.s.; 1st floor- 1 2-compt. k.s., 1 d.w., 2 w.c., 2 w.b., 1 shower, 1 b.t.

    Applied Oct 24, 2001 · issued Oct 24, 2001 · completed Jun 8, 2026 · Permit 01 188993 PLB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 871 St Clarens Ave · Minor variance

    To alter the existing three-storey (7-unit) detached apartment building by constructing one additional residential dwelling unit within the basement. There will be a total of 9 residential dwelling units on this lot (8 units within the main building and one unit within the two-storey detached ancillary building (two-car garage, and one laneway suite). There will be a total of six bicycle parking spaces (4 long-term spaces for the main dwelling, and 2 spaces for the laneway suite), located along the south wall of the ancillary building.

    10 m away · filed Oct 16, 2025 · Approved

  • 31 Powerhouse St · Minor variance

    To alter the existing three-storey mixed-use building by converting two office units into two residential dwelling units.

    200 m away · filed May 16, 2025 · Approved

  • 30 Powerhouse St · Minor variance

    To alter the redevelopment plan for a seven-storey mixed-use building (as approved under Site Specific Zoning By-law 241-2024) by permitting no indoor and outdoor residential amenity space. There will be a total of eight residential dwelling units within this building.

    220 m away · filed Jul 10, 2024 · Approved

  • 875 St Clarens Ave · Minor variance

    To alter the existing one-storey ancillary building (garage), in the rear yard, abutting the laneway, by constructing a complete second storey addition above, to contain one parking space and one laneway suite.

    10 m away · filed Oct 30, 2023 · Approved

  • 875 St Clarens Ave · Minor variance

    To construct a complete second storey addition above the existing one-storey detached ancillary building, to contain one laneway suite.

    10 m away · filed Aug 8, 2023 · Refused

  • 871 St Clarens Ave · Minor variance

    To construct a new three-storey, 6-unit apartment building with front and rear second storey balconies, front and rear third storey balconies, and new north and south side entrances. This application is expanding on the already approved Committee of Adjustment applications A0968/19TEY and A1273/21TEY.

    10 m away · filed Jul 19, 2023 · Approved

  • 900 Lansdowne Ave · Minor variance

    To reduce the width and length of 28 parking spaces provided for small vehicles. There will be a total of 827 parking spaces provided on-site.

    190 m away · filed Jan 25, 2023 · Approved

  • 30 Powerhouse St · Minor variance

    To alter the existing mixed-use building by reconstructing the exterior staircase (fire escape) which is in disrepair.

    220 m away · filed Oct 22, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.