91 Queensbury Ave

The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed architecutral and structural design for interior alterations on ground and second floors. Proposed addition of a bedroom with a washroom on second floor. Rebuild existing garage

    Applied Jul 3, 2025 · issued Jul 16, 2025 · Permit 24 188171 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposed architecutral and structural design for interior alterations on ground and second floors. Proposed addition of a bedroom with a washroom on second floor. Rebuild existing garage

    Applied Jul 26, 2024 · issued Mar 25, 2025 · 1 home removed · Permit 24 188171 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed architecutral and structural design for interior alterations on ground and second floors. Proposed addition of a bedroom with a washroom on second floor. Rebuild existing garage

    Applied Jul 26, 2024 · issued Mar 25, 2025 · completed Jan 29, 2026 · Permit 24 188171 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 160-184 Clonmore Drive

    121 homes · Residential

    210 m away · Condominium · Approved · filed Jul 15, 2021

    Approved
  • 150 Clonmore Drive

    12 storeys · 287 homes · Residential

    220 m away · Site plan · Under review · filed Mar 23, 2022

    Under review
  • 2535 Gerrard Street East

    Not stated in the file

    370 m away · Rezoning · Approved · filed Apr 29, 2025

    Approved
  • 1336 Kingston Road

    8 storeys · 112 homes · Residential

    410 m away · Site plan · Under review · filed Aug 9, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Red Deer Ave · Minor variance

    To alter the existing one-storey dwelling by constructing a second storey and rear yard addition with a front and rear platform. There will be a total of two dwelling units on the lot.

    250 m away · filed Jun 10, 2026 · Approved

  • 46 Dodge Rd · Minor variance

    To convert attic to living space and create a 1-1/2 storey single detached dwelling.

    190 m away · filed Aug 21, 2023 · Approved

  • 156 Cornell Ave · Minor variance

    To permit a single-storey addition.

    220 m away · filed Jul 27, 2023 · Approved

  • 76 Ferncroft Dr · Minor variance

    To demolish existing dwelling and to construct a new two-storey dwelling.

    130 m away · filed Sep 13, 2022 · Approved

  • 168 Clonmore Dr · Minor variance

    To permit stacked townhouse units within seven (7) buildings (under construction). Cross Reference Site Plan Control Application 22 128778 ESC 20 SA. NOTE: This application was deferred on October 13, 2022 in order to include two additional variances identified during the review of the application.

    200 m away · filed Jul 31, 2022 · Approved

  • 30 Red Deer Ave · Minor variance

    To construct a second storey addition to existing dwelling with a new rear yard deck and front yard porch.

    210 m away · filed Apr 25, 2022 · Approved

  • 44 Queensbury Ave · Minor variance

    To permit the existing shed to remain as constructed.

    210 m away · filed Mar 9, 2022 · Approved

  • 196 Audrey Ave · Minor variance

    To reduce the width of the garage. A previous committee of adjustment application (A0151/19SC) approved variances to construct a new two-storey detached dwelling.

    180 m away · filed Jan 18, 2022 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.